Inspection Detail
Inspection: 312665425 - Tl Pavlich Construction Inc
Inspection Information - Office: Monrovia District Office
Site Address:
Tl Pavlich Construction Inc
On Street In Front Of 416 Lincoln Ave
Montebello, CA 90640
Mailing Address:
7256 Weaver Street, Highland, CA 92346
Union Status: Union
SIC:1623
NAICS: 237110/Water and Sewer Line and Related Structures Construction
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Health
Close Conference: 04/14/2011
Planning Guide: Health-Construction
Emphasis:
Case Closed: 10/06/2022
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 101809507 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 4 | 3 | 3 | 10 | ||
Current Violations | 4 | 3 | 3 | 10 | ||
Initial Penalty | $18,900 | $210,000 | $0 | $955 | $0 | $229,855 |
Current Penalty | $8,162 | $140,000 | $0 | $440 | $0 | $148,602 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Other | 5155 E01 | 04/14/2011 | 05/14/2011 | $135 | $175 | $0 | 05/12/2011 | J - ALJ Decision | |
2. | 01002 | Other | 5158 C01 | 04/14/2011 | 05/14/2011 | $305 | $390 | $0 | 05/12/2011 | J - ALJ Decision | |
3. | 01003 | Other | 5158 C02 | 04/14/2011 | 05/14/2011 | $0 | $390 | $0 | 05/12/2011 | J - ALJ Decision | |
4. | 02001 | Serious | 1509 A | 04/14/2011 | 12/17/2012 | $3,710 | $4,725 | $0 | 05/12/2011 | J - ALJ Decision | |
5. | 03001 | Serious | 1541 G01 A | 04/14/2011 | 04/21/2011 | $371 | $4,725 | $0 | 05/12/2011 | J - ALJ Decision | |
6. | 04001 | Serious | 1541 G02 A | 04/14/2011 | 04/21/2011 | $3,710 | $4,725 | $0 | 05/12/2011 | J - ALJ Decision | |
7. | 05001 | Serious | 5158 E01 C | 04/14/2011 | 04/21/2011 | $371 | $4,725 | $0 | 05/12/2011 | J - ALJ Decision | |
8. | 06001 | Willful | 5158 D02 | 04/14/2011 | 04/21/2011 | $70,000 | $70,000 | $0 | 05/12/2011 | J - ALJ Decision | |
9. | 07001 | Willful | 5158 D03 | 04/14/2011 | 04/21/2011 | $70,000 | $70,000 | $0 | 05/12/2011 | J - ALJ Decision | |
10. | 08001 | Willful | 5158 D08 | 04/14/2011 | 04/21/2011 | $0 | $70,000 | $0 | 05/12/2011 | J - ALJ Decision |
Investigation Summary
At 8:00 a.m. on December 14, 2010, Employee #1, a welder, set up welding equipment on a construction worksite located on a public residential road in Montebello, California. Employee #1 set up the welding equipment inside a 30 in. concrete line steel pipe located 12 ft below grade. An overnight accumulation of methane was probably present in the soils of Montebello due to abandoned oil and gas wells in the area. Preentry purging of the air and air monitoring within the confined space was not conducted. The shield metal arc welding equipment sparked. The spark ignited flammable gases and caused a flash fire in the pipe. Employee #1 received second and third degree burns from the fire. Employee #1 was hospitalized for more than 24 hours and treated for his burns. That same day, Cal/OSHA received a report of the accident.
Keywords: BURN, CONFINED SPACE, AIR MONITORING, FIRE, WELDER, CONSTRUCTION, NATURAL GAS, UNDRGRD INSTALLATION, CONCRETE PIPE, PURGING
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 312665425 | Hospitalized injury | Burn/Scald(Heat) | Welders and cutters |