Inspection Detail
Inspection: 312648025 - C P M Development Corp
Inspection Information - Office: Dosh Yakima Service Location, Yakima, Wa
Site Address:
C P M Development Corp
Exit 58
Granger, WA 98932
Mailing Address:
Po Box H, Pasco, WA 99302
Union Status: Union
SIC:3273
NAICS: 327320/Ready-Mix Concrete Manufacturing
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 11/14/2008
Emphasis: L:Wasafety
Case Closed: 11/14/2008
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 102369055 |
Investigation Summary
At approximately 9:52 a.m. on November 13, 2008, Employee #1, a driver working for Central Pre-Mix Concrete, was traveling westbound on Interstate 82, when the truck swerved into the median. Further investigation revealed that he suffered a heart attack and died.
Keywords: CARDIOVASC SYSTEM, HEART ATTACK, TRUCK DRIVER
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 312648025 | Fatality | Other | Occupation not reported |
Translate