Inspection Detail
Inspection: 311493357 - Rayloc
Inspection Information - Office: Department Of Labor, Licensing, And Regulation Division Of Labor And Industry Maryland Occupational Safety And Health
Site Address:
Rayloc
100 Rayloc Drive
Hancock, MD 21750
Mailing Address:
, , 00000
Union Status: NonUnion
SIC:3714
NAICS: 336322/Other Motor Vehicle Electrical and Electronic Equipment Manufacturing
Inspection Type: Accident
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 10/09/2007
Planning Guide: Safety-Manufacturing
Emphasis: S:Manufacturing(2000-3999)
Case Closed: 02/22/2008
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 102361326 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 6 | 3 | 9 | |||
Current Violations | 6 | 3 | 9 | |||
Initial Penalty | $17,200 | $0 | $0 | $0 | $0 | $17,200 |
Current Penalty | $7,740 | $0 | $0 | $0 | $0 | $7,740 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19100212 A01 | 01/18/2008 | 01/19/2008 | $1,350 | $2,700 | $0 | I - Informal Settlement | ||
2. | 01002 | Serious | 19100212 A03 II | 01/18/2008 | 01/19/2008 | $1,350 | $2,700 | $0 | I - Informal Settlement | ||
3. | 01003A | Serious | 19100213 C02 | 01/18/2008 | 01/19/2008 | $1,350 | $2,700 | $0 | I - Informal Settlement | ||
4. | 01003B | Serious | 19100213 D01 | 01/18/2008 | 01/19/2008 | $0 | $0 | $0 | I - Informal Settlement | ||
5. | 01004 | Serious | 19100219 D01 | 01/18/2008 | 01/19/2008 | $1,350 | $2,700 | $0 | I - Informal Settlement | ||
6. | 01005 | Serious | 19100243 C04 | 01/18/2008 | 01/19/2008 | $1,350 | $2,700 | $0 | I - Informal Settlement | ||
7. | 01006 | Serious | 5A0001 | 01/18/2008 | 01/19/2008 | $990 | $3,700 | $0 | I - Informal Settlement | ||
8. | 02001 | Other | 19100132 A | 01/18/2008 | 01/23/2008 | $0 | $0 | $0 | I - Informal Settlement | ||
9. | 02002 | Other | 19100242 B | 01/18/2008 | 01/19/2008 | $0 | $0 | $0 | I - Informal Settlement | ||
10. | 02003 | Other | 19100305 G01 IV | 01/18/2008 | 01/19/2008 | $0 | $0 | $0 | I - Informal Settlement |
Investigation Summary
On October 4, 2007, Employees #1 and #2 were filling a 33.5-gallon propane tank. The evening was humid and there was little to no air movement. The filling hose was connected to the tank. When the tank was full one employee attempted to shut the valve off and remove the hose. It would not turn off. The second went to the main tank and shut the emergency shut off valve. The tank kept leaking propane. Employee # 1 instructed Employee # 2 to move a forklift that was parked nearby. When he started the forklift, a flash fire occurred. According to the Fire Marshall, the propane tank was faulty and the valve inside the tank would not close, allowing the tank to leak out. Employee # 1 received second-degree and third-degree burns during the flash fire and was hospitalized. Employee # 2 received first-degree burns and was treated and released from the hospital the same day.
Keywords: BURN, FIRE, EQUIPMENT FAILURE, INDUSTRIAL TRUCK, VALVE, PROPANE
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 311493357 | Hospitalized injury | Burn/Scald(Heat) | Machinery maintenance occupations | ||
2 | 311493357 | Hospitalized injury | Burn/Scald(Heat) | Machinery maintenance occupations |