Inspection Detail
Inspection: 310818885 - Bert W Salas Inc
Inspection Information - Office: San Diego District Office
Site Address:
Bert W Salas Inc
16251 Bandy Canyon Rd
San Diego, CA 92025
Mailing Address:
10769 Woodside Ave # 205, Santee, CA 92071
Union Status: Union
SIC:1622
NAICS: 237310/ Highway, Street, and Bridge Construction
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 01/21/2009
Planning Guide: Safety-Construction
Emphasis:
Case Closed: 03/22/2010
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 101074078 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 1 | 11 | 12 | |||
| Current Violations | 12 | 12 | ||||
| Initial Penalty | $12,600 | $0 | $0 | $6,330 | $0 | $18,930 |
| Current Penalty | $0 | $0 | $0 | $6,450 | $0 | $6,450 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Other | 340 | 01/21/2009 | 03/10/2009 | $150 | $225 | $0 | 02/09/2009 | F - Formal Settlement | |
| 2. | 01002 | Other | 342 A | 01/21/2009 | 03/10/2009 | $1,500 | $5,000 | $0 | 02/09/2009 | F - Formal Settlement | |
| 3. | 01003 | Other | 3203 B01 | 01/21/2009 | 03/10/2009 | $150 | $225 | $0 | 02/09/2009 | F - Formal Settlement | |
| 4. | 01004 | Other | 1509 A | 01/21/2009 | 03/10/2009 | $75 | $110 | $0 | 02/09/2009 | F - Formal Settlement | |
| 5. | 01005 | Other | 1509 C | 01/21/2009 | 03/10/2009 | $75 | $110 | $0 | 02/09/2009 | F - Formal Settlement | |
| 6. | 01006 | Other | 1512 B | 01/21/2009 | 03/10/2009 | $75 | $110 | $0 | 02/09/2009 | F - Formal Settlement | |
| 7. | 01007 | Other | 1527 A | 01/21/2009 | 03/10/2009 | $75 | $110 | $0 | 02/09/2009 | F - Formal Settlement | |
| 8. | 01008 | Other | 3395 E01 | 01/21/2009 | 03/10/2009 | $75 | $110 | $0 | 02/09/2009 | F - Formal Settlement | |
| 9. | 01009 | Other | 5194 E01 | 01/21/2009 | 03/10/2009 | $75 | $110 | $0 | 02/09/2009 | F - Formal Settlement | |
| 10. | 01010 | Other | 5194 G08 | 01/21/2009 | 03/10/2009 | $75 | $110 | $0 | 02/09/2009 | F - Formal Settlement | |
| 11. | 01011 | Other | 5194 H01 | 01/21/2009 | 03/10/2009 | $75 | $110 | $0 | 02/09/2009 | F - Formal Settlement | |
| 12. | 02001 | Other | 1670 A | 01/21/2009 | 02/04/2009 | $4,050 | $12,600 | $0 | 02/09/2009 | F - Formal Settlement |
Investigation Summary
At approximately 8:12 a.m. on September 30, 2008, Employee #1 was using a portable saw to cut through a wooden plank, measuring 8-feet long by 5.25-feet wide by 5.38-feet thick. This section of word was part of decking for a pedestrian/horse trail that spanned 250 feet. The wooden portion undergoing construction had significant burn damage as a result of wild wires in October of 2007. Each wooden plank is fastened down to steel support beams that make up the frame of the bridge. As Employee #1 was cutting through the wood plank, which had burn damage, it became unfastened from one of the steel support beams. Employee #1, as well as his supervisor, who was located nearby, fell through the opening in the decking and landed in a dry sandy river bed that was approximately 25 feet below. Employee #1 was taken to Palomar Hospital in Escondido by helicopter, where he was hospitalized and treated for fractures to his ribs, pelvis, tailbone, and vertebras, as well as a ruptured spleen and lacerated liver.
Keywords: FRACTURE, SPLEEN, CONSTRUCTION, LIVER, PELVIS, RIB, UNSTABLE SURFACE, FALL, BRIDGE, VERTEBRA
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 310818885 | Hospitalized injury | Fracture | Laborers, except construction |
Translate