Inspection Detail
Inspection: 310604004 - Pacific Builders & Roofing Inc Dba Wsp Roofing
Inspection Information - Office: San Bernardino District Office
Site Address:
Pacific Builders & Roofing Inc Dba Wsp Roofing
30472 Haun Rd
1enifee, CA 92584
Mailing Address:
8535 Sultana Ave Ste B, Fontana, CA 92335
Union Status: NonUnion
SIC:1761
NAICS: 238160/Roofing Contractors
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Health
Close Conference: 10/28/2008
Emphasis:
Case Closed: 04/11/2017
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 102553179 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 3 | 2 | 5 | |||
| Current Violations | 3 | 2 | 5 | |||
| Initial Penalty | $24,300 | $0 | $0 | $1,300 | $0 | $25,600 |
| Current Penalty | $24,300 | $0 | $0 | $1,300 | $0 | $25,600 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Other | 1509 A | 10/28/2008 | 11/21/2008 | $650 | $650 | $0 | - | ||
| 2. | 01002 | Other | 3395 E03 | 10/28/2008 | 11/21/2008 | $650 | $650 | $0 | - | ||
| 3. | 02001 | Serious | 1509 A | 10/28/2008 | 11/12/2008 | $8,100 | $8,100 | $0 | - | ||
| 4. | 03001 | Serious | 3395 E01 | 10/28/2008 | 11/12/2008 | $8,100 | $8,100 | $0 | - | ||
| 5. | 04001 | Serious | 3395 D | 10/28/2008 | 11/12/2008 | $8,100 | $8,100 | $0 | - |
Investigation Summary
On July 15, 2008, Employee #1 was working for a roofing contractor. It was his first day on the job with no prior roofing or construction experience. The temperature on the street level was measured on site to be 100 degree Fahrenheit and the relative humidity was 59 percent. Sufficient drinking water was available and a source of shade was provided in the form of a canopy. E1 was not provided training on heat illness prevention, including the importance of acclimatization. He arrived on site at 6:00 a.m., took a 10 minute break at 8:45 a.m. and a 30 minute lunch break at 10:30 a.m. As a new hire, he helped the roofing crew lay roofing material, snapping lines, and housekeeping. At Approximately 12:45 p.m., he started to complain of dizziness and cramps. He was transported to a hospital where he was treated and released the same day for heat exhaustion.
Keywords: ROOF, CONSTRUCTION, ROOFER, HEAT EXHAUSTION, UNTRAINED, WATER
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 310604004 | Non Hospitalized injury | Heat Exhaustion | Construction laborers |
Translate