Powered by GoogleTranslate

Inspection Detail

Inspection: 310125844 - Bowlin Energy, Llc

Inspection Information - Office: Ky Labor Cabinet Division Of Osh Compliance

 

Inspection Nr: 310125844
Report ID: 0452110
Date Opened: 11/14/2006

Site Address:
Bowlin Energy, Llc
12025 Hwy 261 S
Mcquady, KY 40153

Mailing Address:
P O Box 250, Owenton, KY 40359

Union Status: NonUnion

SIC:1623

NAICS: 237130/Power and Communication Line and Related Structures Construction


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 02/01/2007

Planning Guide: Safety-Construction

Emphasis:

Case Closed: 12/13/2016


Related Activity
Type Activity Nr Safety Health
Accident 101869600
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 12 1 13
Current Violations 7 2 9
Initial Penalty $36,750 $0 $0 $3,500 $0 $40,250
Current Penalty $21,000 $0 $0 $100 $0 $21,100
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19260028 A 05/08/2007 05/14/2007 $1,750 $3,500 $0 05/31/2007 2 - Appeals Court  
2. 01002 Other 19260050 D02 05/08/2007 05/14/2007 $0 $1,750 $0 05/31/2007 2 - Appeals Court  
3. 01003 Serious 19260201 A01 05/08/2007 05/14/2007 $3,500 $1,750 $0 05/31/2007 I - Informal Settlement  
4. 01004 Serious 19260453 B02 V 05/08/2007 05/14/2007 $3,500 $3,500 $0 05/31/2007 I - Informal Settlement  
5. 01005 Serious 19260453 B02 VII 05/08/2007 05/14/2007 $5,250 $3,500 $0 05/31/2007 I - Informal Settlement  
6. 01006 Serious 19260453 B02 IX 05/08/2007 05/14/2007 $3,500 $3,500 $0 05/31/2007 I - Informal Settlement  
7. 01007 Serious 19260453 B02 XI 05/08/2007 05/14/2007 $0 $3,500 $0 05/31/2007 R - Review Commission Citation has been deleted.
8. 01008 Serious 19260950 C01 05/08/2007 05/14/2007 $1,750 $3,500 $0 05/31/2007 2 - Appeals Court  
9. 01009 Serious 19260951 A01 III 05/08/2007 05/14/2007 $0 $1,750 $0 05/31/2007 R - Review Commission Citation has been deleted.
10. 01010 Serious 19260952 A01 05/08/2007 05/14/2007 $0 $3,500 $0 05/31/2007 2 - Appeals Court Citation has been deleted.
11. 01011 Serious 19260952 B02 05/08/2007 05/14/2007 $0 $3,500 $0 05/31/2007 2 - Appeals Court Citation has been deleted.
12. 01012 Serious 19260955 A06 05/08/2007 05/14/2007 $1,750 $3,500 $0 05/31/2007 R - Review Commission  
13. 02001 Other 201800302 05/08/2007 05/08/2007 $100 $3,500 $0 05/31/2007 2 - Appeals Court  

Investigation Summary

Investigation Nr: 201859030
Event: 11/13/2006
Employee electrocuted installing guy line on utility pole

On November 13, 2006, Employee #1, a power line worker, was in an aerial lift, installing a guy line on a new pole when he apparently crossed a 7,200-volt phase line and the neutral. He was electrocuted. Employee #1 was evidently wearing leather work gloves at the time of the accident.

Keywords: ELEC PROTECT EQUIP, INSTALLING, OVERHEAD POWER LINE, POWER LINE WORKER, ELECTROCUTED, CONSTRUCTION, ELEC CIRC PART--MISC, ELEC UTILITY WORK, AERIAL LIFT

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 310125844 Fatality Electric Shock Electrical power installers and repairers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close