Powered by GoogleTranslate

Inspection Detail

Inspection: 309200541 - Skg Construction Corp

Inspection Information - Office: Albany Area Office

 

Inspection Nr: 309200541
Report ID: 0213100
Date Opened: 08/05/2005

Site Address:
Skg Construction Corp
332-46 Main St
Poughkeepsie, NY 12602

Mailing Address:
28-18 31st St, Astoria, NY 11102

Union Status: NonUnion

SIC:1542

NAICS: 236220/Commercial and Institutional Building Construction


Inspection Type: Referral

Scope: Complete

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 12/01/2005

Emphasis: L:Fall

Case Closed: 07/19/2006


Related Activity
Type Activity Nr Safety Health
Referral 200747137 Yes
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 45 5 50
Current Violations 45 5 50
Initial Penalty $60,750 $0 $0 $0 $0 $60,750
Current Penalty $36,250 $0 $0 $0 $0 $36,250
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19100178 L 01/19/2006 08/30/2006 $600 $1,000 $0 02/22/2006 F - Formal Settlement  
2. 01002 Serious 19260020 B01 01/19/2006 08/30/2006 $600 $1,000 $0 02/22/2006 F - Formal Settlement  
3. 01003 Serious 19260020 B02 01/19/2006 08/30/2006 $600 $1,000 $0 02/22/2006 F - Formal Settlement  
4. 01004 Serious 19260021 B02 01/19/2006 08/30/2006 $600 $1,000 $0 02/22/2006 F - Formal Settlement  
5. 01005 Serious 19260024 01/19/2006 08/30/2006 $600 $1,000 $0 02/22/2006 F - Formal Settlement  
6. 01006 Serious 19260095 A 01/19/2006 08/30/2006 $1,050 $1,750 $0 02/22/2006 F - Formal Settlement  
7. 01007 Serious 19260150 C01 I 01/19/2006 08/30/2006 $600 $1,000 $0 02/22/2006 F - Formal Settlement  
8. 01008 Serious 19260152 A01 01/19/2006 07/28/2006 $450 $750 $0 02/22/2006 F - Formal Settlement  
9. 01009 Serious 19260152 C04 I 01/19/2006 07/28/2006 $450 $750 $0 02/22/2006 F - Formal Settlement  
10. 01010 Serious 19260152 E04 01/19/2006 07/28/2006 $450 $750 $0 02/22/2006 F - Formal Settlement  
11. 01011 Serious 19260152 G11 01/19/2006 07/28/2006 $450 $750 $0 02/22/2006 F - Formal Settlement  
12. 01012 Serious 19260251 C05 I 01/19/2006 07/28/2006 $600 $1,000 $0 02/22/2006 F - Formal Settlement  
13. 01013 Serious 19260303 C03 01/19/2006 07/28/2006 $600 $1,000 $0 02/22/2006 F - Formal Settlement  
14. 01014 Serious 19260350 A01 01/19/2006 07/28/2006 $1,050 $1,750 $0 02/22/2006 F - Formal Settlement  
15. 01015 Serious 19260350 A09 01/19/2006 07/28/2006 $1,050 $1,750 $0 02/22/2006 F - Formal Settlement  
16. 01016 Serious 19260350 A10 01/19/2006 07/28/2006 $1,050 $1,750 $0 02/22/2006 F - Formal Settlement  
17. 01017 Serious 19260403 I02 I 01/19/2006 07/28/2006 $600 $1,000 $0 02/22/2006 F - Formal Settlement  
18. 01018 Serious 19260404 B01 I 01/19/2006 07/28/2006 $1,500 $2,500 $0 02/22/2006 F - Formal Settlement  
19. 01019 Serious 19260404 F06 01/19/2006 01/24/2006 $600 $1,000 $0 02/22/2006 F - Formal Settlement  
20. 01020 Serious 19260405 A02 IIE 01/19/2006 07/28/2006 $600 $1,000 $0 02/22/2006 F - Formal Settlement  
21. 01021 Serious 19260405 A02 IIF 01/19/2006 07/28/2006 $450 $750 $0 02/22/2006 F - Formal Settlement  
22. 01022 Serious 19260405 A02 IIC 01/19/2006 07/28/2006 $1,050 $1,750 $0 02/22/2006 F - Formal Settlement  
23. 01023 Serious 19260451 A06 01/19/2006 01/24/2006 $750 $1,250 $0 02/22/2006 F - Formal Settlement  
24. 01024 Serious 19260451 B01 I 01/19/2006 07/28/2006 $1,500 $2,500 $0 02/22/2006 F - Formal Settlement  
25. 01025 Serious 19260451 C01 01/19/2006 01/24/2006 $450 $750 $0 02/22/2006 F - Formal Settlement  
26. 01026 Serious 19260451 F03 01/19/2006 01/24/2006 $750 $1,250 $0 02/22/2006 F - Formal Settlement  
27. 01027 Serious 19260451 G01 01/19/2006 01/24/2006 $1,500 $2,500 $0 02/22/2006 F - Formal Settlement  
28. 01028 Serious 19260454 A 01/19/2006 08/30/2006 $750 $1,250 $0 02/22/2006 F - Formal Settlement  
29. 01029 Serious 19260501 B01 01/19/2006 07/28/2006 $1,500 $2,500 $0 02/22/2006 F - Formal Settlement  
30. 01030 Serious 19260501 B04 I 01/19/2006 07/28/2006 $1,500 $2,500 $0 02/22/2006 F - Formal Settlement  
31. 01031 Serious 19260501 B14 01/19/2006 07/28/2006 $750 $1,250 $0 02/22/2006 F - Formal Settlement  
32. 01032 Serious 19260502 I03 01/19/2006 07/28/2006 $750 $1,250 $0 02/22/2006 F - Formal Settlement  
33. 01033 Serious 19260503 A01 01/19/2006 08/30/2006 $750 $1,250 $0 02/22/2006 F - Formal Settlement  
34. 01034 Serious 19260552 A01 01/19/2006 07/28/2006 $750 $1,250 $0 02/22/2006 F - Formal Settlement  
35. 01035 Serious 19260552 A03 II 01/19/2006 07/28/2006 $750 $1,250 $0 02/22/2006 F - Formal Settlement  
36. 01036 Serious 19260554 A01 01/19/2006 07/28/2006 $750 $1,250 $0 02/22/2006 F - Formal Settlement  
37. 01037 Serious 19260706 A01 01/19/2006 01/24/2006 $1,500 $2,500 $0 02/22/2006 F - Formal Settlement  
38. 01038 Serious 19260706 B 01/19/2006 01/24/2006 $1,500 $2,500 $0 02/22/2006 F - Formal Settlement  
39. 01039 Serious 19260756 E02 01/19/2006 07/28/2006 $750 $1,250 $0 02/22/2006 F - Formal Settlement  
40. 01040 Serious 19260761 B 01/19/2006 08/30/2006 $750 $1,250 $0 02/22/2006 F - Formal Settlement  
41. 01041 Serious 19260761 C02 01/19/2006 08/30/2006 $750 $1,250 $0 02/22/2006 F - Formal Settlement  
42. 01042 Serious 19260850 A 01/19/2006 07/28/2006 $750 $1,250 $0 02/22/2006 F - Formal Settlement  
43. 01043 Serious 19261052 A04 01/19/2006 07/28/2006 $450 $750 $0 02/22/2006 F - Formal Settlement  
44. 01044 Serious 19261052 C01 01/19/2006 07/28/2006 $500 $1,000 $0 02/22/2006 F - Formal Settlement  
45. 01045 Serious 19261060 A 01/19/2006 08/30/2006 $500 $1,000 $0 02/22/2006 F - Formal Settlement  
46. 02001 Other 19260152 G09 01/19/2006 07/28/2006 $0 $0 $0 02/22/2006 F - Formal Settlement  
47. 02002 Other 19260403 H 01/19/2006 07/28/2006 $0 $0 $0 02/22/2006 F - Formal Settlement  
48. 02003 Other 19260405 A02 III 01/19/2006 07/28/2006 $0 $0 $0 02/22/2006 F - Formal Settlement  
49. 02004 Other 19260405 B01 01/19/2006 07/28/2006 $0 $0 $0 02/22/2006 F - Formal Settlement  
50. 02005 Other 19260502 I04 01/19/2006 07/28/2006 $0 $0 $0 02/22/2006 F - Formal Settlement  

Investigation Summary

Investigation Nr: 200741999
Event: 07/27/2005
Employee Is Crushed by Collapsed Concrete Block Wall

On July 27, 2005, Employee #1 was in the process of moving his car directly below a newly constructed concrete block wall. A high wind and rain storm caused the unbraced wall to collapse on top of the car with the employee inside. He was hospitalized with an unspecified fracture.

Keywords: FRACTURE, WALL, COLLAPSE, CONCRETE

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 309200541 Hospitalized injury Fracture Construction laborers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close