Inspection Detail
Inspection: 308379221 - Hill'S Wiring
Inspection Information - Office: Madison Area Office
Site Address:
Hill'S Wiring
707 14th Street
Baraboo, WI 53913
Mailing Address:
615 Hill Street, Baraboo, WI 53913
Union Status: NonUnion
SIC:1731
NAICS: 238210/Electrical Contractors
Inspection Type: Unprog Rel
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Health
Close Conference: 04/12/2005
Planning Guide: Health-Construction
Emphasis:
Case Closed: 05/09/2005
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 100801075 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 2 | 2 | ||||
| Current Violations | 2 | 2 | ||||
| Initial Penalty | $750 | $0 | $0 | $0 | $0 | $750 |
| Current Penalty | $375 | $0 | $0 | $0 | $0 | $375 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001A | Serious | 19260055 A | 04/21/2005 | 04/26/2005 | $188 | $375 | $0 | I - Informal Settlement | ||
| 2. | 01001B | Serious | 19260055 B | 04/21/2005 | 04/26/2005 | $0 | $0 | $0 | I - Informal Settlement | ||
| 3. | 01002 | Serious | 19101200 H | 04/21/2005 | 04/26/2005 | $188 | $375 | $0 | I - Informal Settlement |
Investigation Summary
On March 2, 2005, Employees #1, #2, and #3 were working in a newly constructed building, which was being powered by an 18-horsepower V-Twin Briggs and Stratton Vanguard gas-powered generator. Employees #1 and #2 were operating chain saws, while Employee #3 worked nearby. After about two hours of exposure to the machine's exhaust fumes, Employee #1 lost consciousness and collapsed, fracturing his cheek bone as he landed. Employee #2, reported feeling dizzy, and Employee #3 also reported being sickened by the carbon monoxide fumes being released by the generator, but he did not lose consciousness. All three employees were admitted to a nearby hospital, where they were hospitalized and treated for carbon monoxide poisoning.
Keywords: UNCONSCIOUSNESS, ASPHYXIATED, PPE, TOXIC ATMOSPHERE, INHALATION, CARBON MONOXIDE, BUILDING, CONSTRUCTION, POISONING
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 308379221 | Hospitalized injury | Poisoning(Systemic) | Electricians |
Translate