Powered by GoogleTranslate

Inspection Detail

Inspection: 305770059 - Day Electrical Contracting Corp

Inspection Information - Office: Tarrytown Area Office

 

Inspection Nr: 305770059
Report ID: 0216000
Date Opened: 04/17/2003

Site Address:
Day Electrical Contracting Corp
550 North Street
White Plains, NY 10605

Mailing Address:
230 Oxford Road, New Rochelle, NY 10804

Union Status: NonUnion

SIC:1731

NAICS: 238210/Electrical Contractors


Inspection Type: Referral

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 08/06/2003

Emphasis: S:Construction

Case Closed: 12/22/2003


Related Activity
Type Activity Nr Safety Health
Referral 202026407 Yes
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 2 2
Current Violations 2 2
Initial Penalty $3,000 $0 $0 $0 $0 $3,000
Current Penalty $2,100 $0 $0 $0 $0 $2,100
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19260095 A 08/14/2003 08/19/2003 $1,050 $1,500 $0 I - Informal Settlement  
2. 01002 Serious 19260416 A01 08/14/2003 08/19/2003 $1,050 $1,500 $0 I - Informal Settlement  

Investigation Summary

Investigation Nr: 202013900
Event: 04/14/2003
Employee's torso burned in electrical explosion

On April 14, 2003, Employee #1, an electrician, was running speaker wire at a school when the school custodian asked him to hook up a temporary electric panel. Employee #1 was installing a 50- or 60-amp circuit breaker in a live, 240-volt, overcurrent circuit panel when an explosion occurred. Employee #1 suffered burns to his upper body, for which he was hospitalized for several days. The live parts were not guarded by insulation. Employee #1 later stated that the panel could not be locked out because there was work going on that required it to be energized. Employee #1 did not have insulated mats, insulated gloves, or a faceshield with him because he did not expect he would need them that day. The equipment was available in his shop, but he later stated that he felt pressured by the school to get the job done, and for that reason did not go and retrieve the PPE. Employee #1 also stated that he may have dropped a screw and that it might have shorted across two phases, causing the explosion. It was normal company practice for the electrician to perform assignments given by certain school coworkers. The owner of the company later stated that he knew his employees sometimes had to work on equipment while it was live, but that he had trained them how to do so safely and had protective equipment available for their use. Upon inspection, the company's safety gloves were last tested in 1981, and the safety mat had some black substance on it; there was no record of when the mat was last tested.

Keywords: BURN, CHEST, ELEC PROTECT EQUIP, INSTALLING, WORK RULES, ELECTRICIAN, CONSTRUCTION, CIRCUIT BREAKER, ELEC CIRC PART--MISC, ELECTRICAL FAULT

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 305770059 Hospitalized injury Burn/Scald(Heat) Electricians
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.