Inspection: 305478711 - Southern California Edison

Inspection Information - Office: Long Beach District Office

 

Inspection Nr: 305478711
Report ID: 0950635
Date Opened: 05/27/2005

Site Address:
Southern California Edison
6371 Chantiles Avenue
Cypress, CA 92683

Mailing Address:
14660 Chestnut Avenue, Westminster, CA 92683

Union Status: Union

SIC:4911

NAICS: 221122/Electric Power Distribution


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: LocalGovt

Safety/Health: Safety

Close Conference: 07/28/2005

Planning Guide: Safety-Construction

Emphasis: S:Construction (Cship)

Case Closed: 09/13/2010


Related Activity
Type Activity Nr Safety Health
Accident 362467482
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 2 2
Current Violations 2 2
Initial Penalty $24,750 $0 $0 $0 $0 $24,750
Current Penalty $0 $0 $0 $560 $0 $560
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Other 23200002 A 07/29/2005 08/03/2005 $0 $6,750 $0 08/08/2005 F - Formal Settlement  
2. 02001 Other 23200003 07/29/2005 08/03/2005 $560 $18,000 $0 08/08/2005 F - Formal Settlement  

Investigation Summary

Investigation Nr: 201037249
Event: 03/07/2005
Burn - Electrical Fault in Cable

On March 7, 2005, Employee #1 was working as an apprentice lineman for the electric utility Southern California Edison in Cypress, CA. He was part of a three-person electrical maintenance crew assigned to restore service to a damaged system. The accident took place in the front yard of a private residence. The system consisted of an underground vault containing a 100-kVA transformer that fed a "hand hole" of conductors energized at 240 volts. A Southern California Edison employee called a "troubleman" had diagnosed the partial electrical blackout in the neighborhood and had bypassed or jumpered the damaged conductor to restore 240-volt service to the neighborhood. When the crew arrived, they located the damage in the cable running from the transformer to the "hand hole" and spliced in a new section, repairing the cable. The previously installed jumper was removed, and the apprentice began to insert the cable that had just been repaired into the secondary block at the "hand hole." As Employee #1 inserted the new energized cable into the secondary block, an arc flash occurred. He had inadvertently placed the energized cable in contact with a different phase at the secondary block, creating a phase-to-phase fault and the electric arc. He sustained severe burns to his right arm and face that required skin grafts and 12 days of hospitalization.

Keywords: BURN, ELECTRIC ARC, ELECTRICAL VAULT, ELECTRICAL, E PTD, ELEC UTILITY WORK, ELECTRICAL FAULT, ELECTRICAL SPLICE, UNDRGRD POWER LINE

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 305478711 Hospitalized injury Burn/Scald(Heat) Electricians' apprentices
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.