Inspection Detail
Inspection: 305478711 - Southern California Edison
Inspection Information - Office: Long Beach District Office
Site Address:
Southern California Edison
6371 Chantiles Avenue
Cypress, CA 92683
Mailing Address:
14660 Chestnut Avenue, Westminster, CA 92683
Union Status: Union
SIC:4911
NAICS: 221122/Electric Power Distribution
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: LocalGovt
Safety/Health: Safety
Close Conference: 07/28/2005
Planning Guide: Safety-Construction
Emphasis: S:Construction (Cship)
Case Closed: 09/13/2010
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 362467482 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 2 | 2 | ||||
| Current Violations | 2 | 2 | ||||
| Initial Penalty | $24,750 | $0 | $0 | $0 | $0 | $24,750 |
| Current Penalty | $0 | $0 | $0 | $560 | $0 | $560 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Other | 23200002 A | 07/29/2005 | 08/03/2005 | $0 | $6,750 | $0 | 08/08/2005 | F - Formal Settlement | |
| 2. | 02001 | Other | 23200003 | 07/29/2005 | 08/03/2005 | $560 | $18,000 | $0 | 08/08/2005 | F - Formal Settlement |
Investigation Summary
On March 7, 2005, Employee #1 was working as an apprentice lineman for the electric utility Southern California Edison in Cypress, CA. He was part of a three-person electrical maintenance crew assigned to restore service to a damaged system. The accident took place in the front yard of a private residence. The system consisted of an underground vault containing a 100-kVA transformer that fed a "hand hole" of conductors energized at 240 volts. A Southern California Edison employee called a "troubleman" had diagnosed the partial electrical blackout in the neighborhood and had bypassed or jumpered the damaged conductor to restore 240-volt service to the neighborhood. When the crew arrived, they located the damage in the cable running from the transformer to the "hand hole" and spliced in a new section, repairing the cable. The previously installed jumper was removed, and the apprentice began to insert the cable that had just been repaired into the secondary block at the "hand hole." As Employee #1 inserted the new energized cable into the secondary block, an arc flash occurred. He had inadvertently placed the energized cable in contact with a different phase at the secondary block, creating a phase-to-phase fault and the electric arc. He sustained severe burns to his right arm and face that required skin grafts and 12 days of hospitalization.
Keywords: BURN, ELECTRIC ARC, ELECTRICAL VAULT, ELECTRICAL, E PTD, ELEC UTILITY WORK, ELECTRICAL FAULT, ELECTRICAL SPLICE, UNDRGRD POWER LINE
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 305478711 | Hospitalized injury | Burn/Scald(Heat) | Electricians' apprentices |
Translate