Inspection: 304209703 - Tingle'S Concrete Construction

Inspection Information - Office: Department Of Labor, Licensing, And Regulation Division Of Labor And Industry Maryland Occupational Safety And Health

 

Inspection Nr: 304209703
Report ID: 0352410
Date Opened: 04/18/2001

Site Address:
Tingle'S Concrete Construction
Oceanscape Condominiums
Ocean City, MD 21842

Mailing Address:
P.O. Box 312, Grasonville, MD 21638

Union Status: NonUnion

SIC:1771

NAICS: 0 


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 05/30/2001

Planning Guide: Safety-Construction

Emphasis:

Case Closed: 08/30/2001


Related Activity
Type Activity Nr Safety Health
Accident 100968155
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 3 5 8
Current Violations 3 5 8
Initial Penalty $7,200 $0 $0 $0 $0 $7,200
Current Penalty $1,800 $0 $0 $0 $0 $1,800
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19260416 A01 06/29/2001 07/05/2001 $600 $2,400 $0 I - Informal Settlement  
2. 02001 Serious 19260416 A03 06/29/2001 07/05/2001 $600 $2,400 $0 I - Informal Settlement  
3. 03001 Serious 19260702 H 06/29/2001 07/02/2001 $600 $2,400 $0 I - Informal Settlement  
4. 04001 Other 50405 B01 06/29/2001 07/05/2001 $0 $0 $0 I - Informal Settlement  
5. 04002 Other 50406 A01 06/29/2001 07/17/2001 $0 $0 $0 I - Informal Settlement  
6. 04003 Other 19101200 E01 06/29/2001 08/01/2001 $0 $0 $0 I - Informal Settlement  
7. 04004 Other 19101200 G01 06/29/2001 07/05/2001 $0 $0 $0 I - Informal Settlement  
8. 04005 Other 19101200 H01 06/29/2001 08/01/2001 $0 $0 $0 I - Informal Settlement  

Investigation Summary

Investigation Nr: 200966562
Event: 04/18/2001
Electric Shock - Contact with Overhead Line thru Bullfloat

The fourth floor decking of a building under construction had been installed, and the floor was ready to receive concrete. The concrete construction contractor started the pour around 9:00 am on the southwest side of the floor. About 30 minutes later, an employee began using a bull float to finish the concrete. The float assembly was constructed of aluminum and was approximately 0.9 to 1.2 meters wide. Its 5.5-meter-long aluminum handle was in three sections, each approximately 1.8 meters long. The employee positioned himself at the south end of the west side of the floor, almost in the corner. The bull float handle contacted a 69-kilovolt overhead power line, and the employee received an electric shock. He was hospitalized for 5 days for his injuries.

Keywords: BURN, OVERHEAD POWER LINE, ELECTRICAL, CONCRETE FLOAT, E C, ELECTRIC SHOCK, CONCRETE

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 304209703 Hospitalized injury Electric Shock Concrete and terrazzo finishers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.