Inspection: 303694202 - Matanuska Electric Association Incorporated

Inspection Information - Office: Alaska Department Of Labor Osh Enforcement

 

Inspection Nr: 303694202
Report ID: 1050210
Date Opened: 10/10/2000

Site Address:
Matanuska Electric Association Incorporated
Lucas Substation
Palmer, AK 99645

Mailing Address:
163 E. Industrial Way, Palmer, AK 99645

Union Status: Union

SIC:4911

NAICS: 0 


Inspection Type: Accident

Scope: Complete

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 01/19/2001

Emphasis: S:Power Generation

Case Closed: 02/05/2003


Related Activity
Type Activity Nr Safety Health
Accident 101680494
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 5 5
Current Violations 5 5
Initial Penalty $16,450 $0 $0 $0 $0 $16,450
Current Penalty $16,450 $0 $0 $0 $0 $16,450
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19100269 M03 V 03/09/2001 03/13/2001 $3,500 $3,500 $0 03/16/2001 W - Empr Withdrew  
2. 01002A Serious 19100269 D02 III 03/09/2001 03/13/2001 $3,500 $3,500 $0 03/16/2001 W - Empr Withdrew  
3. 01002B Serious 19100269 D02 I 03/09/2001 03/13/2001 $0 $0 $0 03/16/2001 W - Empr Withdrew  
4. 01003A Serious 19100269 M02 I 03/09/2001 03/13/2001 $3,500 $3,500 $0 03/16/2001 W - Empr Withdrew  
5. 01003B Serious 19100269 M03 II 03/09/2001 03/13/2001 $0 $0 $0 03/16/2001 W - Empr Withdrew  
6. 01004A Serious 19100269 A02 VII 03/09/2001 03/15/2001 $3,500 $3,500 $0 03/16/2001 W - Empr Withdrew  
7. 01004B Serious 19100269 A02 IVC 03/09/2001 03/15/2001 $0 $0 $0 03/16/2001 W - Empr Withdrew  
8. 01004C Serious 19100269 A02 III 03/09/2001 03/15/2001 $0 $0 $0 03/16/2001 W - Empr Withdrew  
9. 01005 Serious 19100269 C 03/09/2001 03/13/2001 $2,450 $2,450 $0 03/16/2001 W - Empr Withdrew  

Investigation Summary

Investigation Nr: 201680477
Event: 10/09/2000
Electric Shock - Direct Contact with Energized Parts

Three journeyman power line workers were replacing a circuit breaker in a substation. They had to loosen an insulator to test it. One of the employees was unable to reach the bolts, which were along the side of the circuit breaker, so one of the other two employees reached into the right side of the cabinet. He contacted energized parts in the adjacent bay. He received an electric shock and fell into the vault below the two bays. His clothing had ignited. He crawled out of the vault without assistance, and his coworkers extinguished his burning clothing. The injured employee was hospitalized. One of his coworkers was also burned, apparently as he was dousing the flames.

Keywords: BURN, ELEC PROTECT EQUIP, ELECTRICAL, POWER LINE WORKER, E PTD, SUBSTATION, CIRCUIT BREAKER, ELEC UTILITY WORK, ELECTRIC SHOCK, FALL

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 303694202 Hospitalized injury Burn/Scald(Heat) Electricians
2 303694202 Non Hospitalized injury Burn/Scald(Heat) Electrical power installers and repairers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.