Inspection Detail
Inspection: 302541883 - United Church Of Christ D/B/A Havenwood-Heritage
Inspection Information - Office: Concord Area Office
Site Address:
United Church Of Christ D/B/A Havenwood-Heritage
149 East Side Drive
Concord, NH 03301
Mailing Address:
33 Christian Avenue, Concord, NH 03301
Union Status: NonUnion
SIC:8059
NAICS: 0
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Health
Close Conference: 04/26/2001
Emphasis:
Case Closed: 06/07/2001
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Referral | 200615193 | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 7 | 2 | 9 | |||
| Current Violations | 7 | 2 | 9 | |||
| Initial Penalty | $20,250 | $0 | $0 | $0 | $0 | $20,250 |
| Current Penalty | $900 | $0 | $0 | $0 | $0 | $900 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Serious | 19100107 C06 | 05/17/2001 | 05/23/2001 | $100 | $2,250 | $0 | I - Informal Settlement | ||
| 2. | 01002 | Serious | 19100134 C01 | 05/17/2001 | 05/31/2001 | $200 | $4,500 | $0 | I - Informal Settlement | ||
| 3. | 01003A | Serious | 19100134 D01 I | 05/17/2001 | 05/31/2001 | $200 | $4,500 | $0 | I - Informal Settlement | ||
| 4. | 01003B | Serious | 19100134 D01 III | 05/17/2001 | 05/31/2001 | $0 | $0 | $0 | I - Informal Settlement | ||
| 5. | 01004 | Serious | 19100134 E01 | 05/17/2001 | 05/31/2001 | $100 | $2,250 | $0 | I - Informal Settlement | ||
| 6. | 01005 | Serious | 19100134 F02 | 05/17/2001 | 05/31/2001 | $100 | $2,250 | $0 | I - Informal Settlement | ||
| 7. | 01006 | Serious | 19100134 K01 | 05/17/2001 | 05/31/2001 | $100 | $2,250 | $0 | I - Informal Settlement | ||
| 8. | 01007A | Serious | 19101200 E01 II | 05/17/2001 | 05/31/2001 | $100 | $2,250 | $0 | I - Informal Settlement | ||
| 9. | 01007B | Serious | 19101200 H02 III | 05/17/2001 | 05/31/2001 | $0 | $0 | $0 | I - Informal Settlement | ||
| 10. | 02001 | Other | 19100133 A01 | 05/17/2001 | 05/23/2001 | $0 | $0 | $0 | I - Informal Settlement | ||
| 11. | 02002 | Other | 19100134 H03 IIB | 05/17/2001 | 05/23/2001 | $0 | $0 | $0 | I - Informal Settlement |
Investigation Summary
Employees #1 and #2 were assigned to paint a 509-square-foot apartment. They were using a spray unit to apply the oil-based primer. Per the material safety data sheet (MSDS), the material contained VM and P Naphtha. The exterior door off of the rear of the living room was opened. A 20-inch box fan was placed in the far corner of the bedroom, pointing toward the room doorway. Another 20-inch box fan was placed near the entrance to the kitchen, blowing directly away from the kitchen doorway opening. No further ventilation was provided. The employees donned their negative pressure half mask respirators with organic vapor cartridges. The spray unit was used to apply about 4.5 gallons of the product in about 40 to 50 minutes. They started to suffer coordination problems and severe eye irritation, then central nervous system problems. They were able to self-rescue, but with some difficulty. Both employees were transported to the hospital and released later in the day. It was estimated that a concentration of up to 13,761 ppm was present in the room.
Keywords: EYE, FAN, VAPOR, VENTILATION, SPRAY PAINTING, PAINT, DOOR, RESPIRATOR
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 302541883 | Non Hospitalized injury | Other | Painters, construction and maintenance | ||
| 2 | 302541883 | Non Hospitalized injury | Other | Painters, construction and maintenance |
Translate