Inspection Detail
Inspection: 301121182 - Miracle Method Bathroom Restoration
Inspection Information - Office: American Canyon District Office
Site Address:
Miracle Method Bathroom Restoration
1600 Aster Drive #53
Antioch, CA 94509
Mailing Address:
5702 Marsh Drive, Ste J, Pacheco, CA 94553
Union Status: NonUnion
SIC:1793
NAICS: 238150/Glass and Glazing Contractors
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 11/20/2002
Emphasis: S:Construction (Cship)
Case Closed: 02/10/2003
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 101480614 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 2 | 4 | 6 | |||
| Current Violations | 2 | 4 | 6 | |||
| Initial Penalty | $3,600 | $0 | $0 | $400 | $0 | $4,000 |
| Current Penalty | $3,600 | $0 | $0 | $400 | $0 | $4,000 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Other | 5144 C | 11/27/2002 | 12/30/2002 | $100 | $100 | $0 | - | ||
| 2. | 01002 | Other | 5144 D01 A | 11/27/2002 | 12/30/2002 | $100 | $100 | $0 | - | ||
| 3. | 01003 | Other | 5144 E01 | 11/27/2002 | 12/30/2002 | $50 | $50 | $0 | - | ||
| 4. | 01004 | Other | 5144 F01 | 11/27/2002 | 12/30/2002 | $150 | $150 | $0 | - | ||
| 5. | 02001 | Serious | 1534 A | 11/27/2002 | 12/09/2002 | $1,800 | $1,800 | $0 | - | ||
| 6. | 03001 | Serious | 1534 B | 11/27/2002 | 12/09/2002 | $1,800 | $1,800 | $0 | - |
Investigation Summary
On August 6, 2002, Employee #1 was performing restoration efforts on a bathroom. As he was sitting on a toilet seat cover, applying Sunrez resin and acetone to a surface, Employee #1 turned on an ultraviolet halogen light. The resin and acetone released volatile vapors, ignited and Employee #1 sustained burns to his forearms. Employee #1 was transported to a medical facility, where he was treated and released. He returned to work the following day.
Keywords: BURN, VENTILATION, FLAMMABLE VAPORS, FIRE, FOREARM, CONSTRUCTION, ACETONE, CHEMICAL VAPOR
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 301121182 | Non Hospitalized injury | Burn(Chemical) | Occupation not reported |
Translate