Inspection: 300955259 - Zenith Electronics Corp.
Inspection Information - Office: Chicago North Area Office
Site Address:
Zenith Electronics Corp.
2407 W. North Avenue
Melrose Park, IL 60160
Mailing Address:
, , 00000
Union Status: Union
SIC:3671
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 01/16/1998
Emphasis:
Case Closed: 06/11/1998
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 101260321 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 3 | 1 | 4 | |||
| Current Violations | 2 | 1 | 3 | |||
| Initial Penalty | $6,000 | $0 | $0 | $0 | $0 | $6,000 |
| Current Penalty | $2,000 | $0 | $0 | $0 | $0 | $2,000 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001A | Serious | 19100038 A03 I | 04/07/1998 | 05/22/1998 | $1,000 | $2,000 | $0 | 04/29/1998 | F - Formal Settlement | |
| 2. | 01001B | Serious | 19100165 B03 | 04/07/1998 | 05/22/1998 | $0 | $0 | $0 | 04/29/1998 | - | |
| 3. | 01002A | Serious | 19100036 B05 | 04/07/1998 | 05/22/1998 | $1,000 | $2,000 | $0 | 04/29/1998 | F - Formal Settlement | |
| 4. | 01002B | Serious | 19100036 B06 | 04/07/1998 | 05/22/1998 | $0 | $0 | $0 | 04/29/1998 | - | |
| 5. | 01002C | Serious | 19100037 Q01 | 03/18/1998 | 05/22/1998 | $0 | $0 | $0 | 04/29/1998 | - | |
| 6. | 01003 | Serious | 19100151 C | 03/18/1998 | 05/22/1998 | $2,000 | $2,000 | $0 | 04/29/1998 | F - Formal Settlement | Citation has been deleted. |
| 7. | 02001 | Other | 19100138 A | 03/18/1998 | 04/21/1998 | $0 | $0 | $0 | 04/29/1998 | - |
Investigation Summary
On December 8, 1997 a leak developed in a hydrofluoric acid check valve, spilling approximately 25-35 gallons of 70 percent hydrofluoric acid in the basement of the Zenith Electronics-Rauland Plant in Melrose Park, IL. A number of employees working in the basement area were exposed to acid vapors to the extent that an emergency evacuation was initiated at the plant. The plant critical processes and pipes were shut down shortly after the evacuation. Employees #1, #2, and #3 were hospitalized after receiving doses of inhalation high enough to require hospitalization. Two employees were kept 24 hours for observation and then released. One employee was kept for 43 hours and then released. Employees #1, #2, and #3 were interviewed after coming back to work at Zenith. All were doing fine. The plant was closed down for three days and a subcontractor, Clean Harbor, was contracted to clean up the initial spill. Zenith maintenance personnel changed the defective valve. The activity of the contracted spill response team on site was observed from outside the regulated area the day after the incident. It appeared to the CSHO, after questioning the on-scene incident commander of Clean Harbor, the clean-up activities, PPE, and methodologies, that these were executed following federal regulations and using good judgment. The CSHO did not initiate an inspection of Clean Harbor.
Keywords: LEAK, ASPHYXIATED, VAPOR, HYDROFLUORIC ACID, INHALATION, SHUT-OFF VALVE, VALVE, PIPE, SPILL, EVACUATION
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 300955259 | Hospitalized injury | Asphyxia | Stock and inventory clerks | ||
| 2 | 300955259 | Hospitalized injury | Asphyxia | Electricians | ||
| 3 | 300955259 | Hospitalized injury | Asphyxia | Laborers, except construction |