Powered by GoogleTranslate

Inspection Detail

Inspection: 300883204 - Warren Asbestos Abatement Contractors Inc

Inspection Information - Office: Sacramento District Office

 

Inspection Nr: 300883204
Report ID: 0950621
Date Opened: 10/20/2005

Site Address:
Warren Asbestos Abatement Contractors Inc
409 Glen Dr
Oroville, CA 95965

Mailing Address:
Po Box 546, Bangor, CA 95914

Union Status: NonUnion

SIC:1799

NAICS: 562910/Remediation Services


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Health

Close Conference: 03/27/2006

Emphasis:

Case Closed: 04/30/2007


Related Activity
Type Activity Nr Safety Health
Accident 101175644
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 2 5 7
Current Violations 2 5 7
Initial Penalty $11,025 $0 $0 $720 $0 $11,745
Current Penalty $5,355 $0 $0 $720 $0 $6,075
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Other 3203 B02 03/28/2006 04/17/2006 $225 $225 $0 06/28/2006 W - Empr Withdrew  
2. 01002 Other 1529 F03 A 03/28/2006 04/17/2006 $110 $110 $0 06/28/2006 W - Empr Withdrew  
3. 01003 Other 1529 H01 B 03/29/2006 04/03/2006 $110 $110 $0 06/28/2006 W - Empr Withdrew  
4. 01004 Other 1529 M04 A 03/28/2006 05/01/2006 $110 $110 $0 06/28/2006 W - Empr Withdrew  
5. 01005 Other 5194 H01 03/29/2006 04/10/2006 $165 $165 $0 06/28/2006 W - Empr Withdrew  
6. 02001 Serious 3395 E01 03/28/2006 04/17/2006 $630 $6,300 $0 06/28/2006 J - ALJ Decision  
7. 03001 Serious 3395 E02 03/28/2006 04/17/2006 $4,725 $4,725 $0 06/28/2006 W - Empr Withdrew  

Investigation Summary

Investigation Nr: 201178753
Event: 10/01/2005
Employee Suffers Heat Stress While Removing Roof

On October 1, 2005, an employee, an asbestos worker, suffered a heat illness after removing a coal tar pitch roof over two days while wearing a Tyvek suit and full face respirator in 90 plus degree Fahrenheit heat and direct sunlight. He cramped up and vomited during the last day of removal but did not inform his supervisor. He went home and suffered cramps, nausea, and vomiting for a day before going to a hospital, where he was admitted and treated for heat related illness and associated medical complications for three days.

Keywords: COAL TAR PITCH, HEAD, HEAT, ROOF, CONSTRUCTION, NAUSEA, HEAT EXHAUSTION, RESPIRATOR, VOMIT

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 300883204 Hospitalized injury Heat Exhaustion Construction laborers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close