Inspection Detail
Inspection: 300839925 - Desilva Gates
Inspection Information - Office: Foster City District Office
Site Address:
Desilva Gates
Redevelopment 101 Gateway Project
East Palo Alto, CA 94303
Mailing Address:
11555 Dublin Boulevard, Pob 2909, Dublin, CA 94568
Union Status: Union
SIC:1542
NAICS: 236220/Commercial and Institutional Building Construction
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 01/06/2004
Emphasis:
Case Closed: 10/18/2006
Investigation Summary
Employee #1 was part of the crew setting up traffic controls to cone-off the area of the streets that were being repaved. Unknown to Employee #1, an oil-spray truck commenced spraying liquid asphalt emulsions even before his crew completed the traffic closures. As Employee #1 was getting a traffic sign on his truck, he heard the warning beeps of the spray truck but did not bother to move away because he did not think the driver of the truck will back right up to him. Employee #1 assumed the driver knew that his truck was in his path. Employee #1 was pinned between the two trucks and was seriously injured. The oil truck driver reported that he did not see Employee #1 or his truck even though the beacon lights of the truck were on. Employee #1 was hospitalized.
Keywords: BACK-UP ALARM, PINNED, TRAFFIC CONTROL, TRUCK, BACKING UP, INATTENTION
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 300839925 | Hospitalized injury | Other | Paving, surfacing and tamping equipment operators |