Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 08/18/1999
Emphasis:
Case Closed: 10/04/2000
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 361803265 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 4 | 4 | ||||
| Current Violations | 4 | 4 | ||||
| Initial Penalty | $4,550 | $0 | $0 | $0 | $0 | $4,550 |
| Current Penalty | $0 | $0 | $0 | $2,275 | $0 | $2,275 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Other | 19100132 D01 I | 08/18/1999 | 06/27/2000 | $650 | $1,300 | $0 | 09/13/1999 | F - Formal Settlement | |
| 2. | 01002A | Other | 19100134 D01 I | 08/18/1999 | 06/27/2000 | $488 | $975 | $0 | 09/13/1999 | F - Formal Settlement | |
| 3. | 01002B | Other | 19100134 F02 | 08/18/1999 | 06/27/2000 | $0 | $0 | $0 | 09/13/1999 | F - Formal Settlement | |
| 4. | 01002C | Other | 19100134 G02 I | 08/18/1999 | 06/27/2000 | $0 | $0 | $0 | 09/13/1999 | F - Formal Settlement | |
| 5. | 01003 | Other | 19100146 C06 | 08/18/1999 | 06/27/2000 | $488 | $975 | $0 | 09/13/1999 | F - Formal Settlement | |
| 6. | 01004 | Other | 19101200 H03 II | 08/18/1999 | 06/27/2000 | $650 | $1,300 | $0 | 09/13/1999 | F - Formal Settlement |
Investigation Summary
At approximately 6:00 p.m. on April 27, 1999, Employee #1 and a coworker, of Freemyer Company, Inc., a cleaning contractor for Nucor Steel, were vacuuming steel scale from the sublevel of a roll mill stacking table. The sublevel area was about 3,800 sq ft and the floor-to-table height averaged about 7 ft. Two other coworkers, employed by Nucor, were also on the sublevel doing scheduled maintenance on the stacker table. Employee #1 told his coworker that the vacuum hose was malfunctioning, so the coworker went to check for problems at the vacuum truck, which was parked approximately 100 ft north of the building. Approximately five minutes later, one of the Nucor employees told the coworker that Employee #1 was down and was being administered CPR. They said they were approximately 30 ft from Employee #1 when they heard his hard hat strike the floor and saw him on the ground, clutching his chest. They administered CPR and summoned help. Emergency responders transported Employee #1 to the local hospital, where he was pronounced dead of an apparent heart attack. Based on the information in the medical examiner's report, a formal investigation was undertaken to determine if Employee #1 might have been exposed to a caustic gas. He had worked in a lime receiving area for the four days prior to his death, but nothing supported the possibility of an exposure to lime dust as a contributing factor in Employee #1's death. A subsequent addendum to the medical examiner's autopsy report listed spontaneous cardiac arrhythmia as the apparent cause of death.
Keywords: CARDIOVASC SYSTEM, HEART, MAINTENANCE, HEART ATTACK, CLEANING
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 300055209 | Fatality | Other | Occupation not reported |