Inspection Detail
Inspection: 2987626 - Duke Power Company
Inspection Information - Office: Nc Department Of Labor - Raleigh
Site Address:
Duke Power Company
Southern States Fertilizer Plant
Creedmoor, NC 27522
Mailing Address:
Post Office Box 1011, Durham, NC 27702
Union Status: Union
SIC:1623
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 09/27/1988
Planning Guide: Safety-Construction
Emphasis:
Case Closed: 01/10/1990
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 360260079 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 1 | 1 | ||||
| Current Violations | ||||||
| Initial Penalty | $420 | $0 | $0 | $0 | $0 | $420 |
| Current Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Serious | 19260950 C01 | 11/02/1988 | 11/08/1988 | $420 | $420 | $0 | D - Govt Dismissed | Citation has been deleted. |
Investigation Summary
A POWER LINE WORKER WAS POSITIONING HIMSELF ON A 45-FOOT UTILITY POLE. HE WAS TO MEASURE THE DISTANCE FROM A CONDUCTOR COMING OUT OF THE TOP OF A CONDUIT TO THE TOP OF A TRANSFORMER. THE EMPLOYEE CONTACTED A 14.4-KILOVOLT OVERHEAD POWER LINE AND RECEIVED AN ELECTRIC SHOCK AND BURNS. HE WAS HOSPITALIZED FOR HIS INJURIES.
Keywords: BURN, ELEC PROTECT EQUIP, OVERHEAD POWER LINE, ELECTRICAL, POWER LINE WORKER, E PTD, ELEC UTILITY WORK, ELECTRIC SHOCK
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 2987626 | Hospitalized injury | Electric Shock | Electrical power installers and repairers |
Translate