Inspection Detail
Inspection: 2979797 - Construction Management Co. Of Raleigh, Inc.
Inspection Information - Office: Nc Department Of Labor - Raleigh
Site Address:
Construction Management Co. Of Raleigh, Inc.
Oneida Molded Plastics Corp. Of Nc, Hwy 70 West
Clayton, NC 27520
Mailing Address:
1000 Trinity Road, Cary, NC 27511
Union Status: NonUnion
SIC:1541
NAICS: 0
Inspection Type: Unprog Rel
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Health
Close Conference: 06/17/1988
Emphasis:
Case Closed: 12/28/1989
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 360262463 |
Investigation Summary
On June 14, 1988, a contractor was using a gasoline-powered saw to cut a concrete floor at an injection molding facility. Carbon monoxide emissions from the saw were distributed throughout the plant by the air conditioning system, which uses 100 percent recirculated air. Employees #1 through #30, machine operators and assemblers at the plant, were treated at a local hospital for carbon monoxide asphyxiation. The employee's carboxyhemoglobin levels ranged from 7.2 to 28.3 percent.
Keywords: AIR CONDITIONER, TOXIC FUMES, CARBON MONOXIDE, PORTABLE POWER TOOL, CARBOXYHEMOGLOBIN, ASPHYXIATED, SAW, EXHAUST FUMES, VENTILATION, INHALATION
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 2979797 | Occupation Not Listed |