Inspection Detail

Inspection: 2511319 - Donco Construction, Inc.

Inspection Information - Office: Fairview Heights Area Office

 

Inspection Nr: 2511319
Report ID: 0524530
Date Opened: 12/23/1986

Site Address:
Donco Construction, Inc.
Road Entering Grand Tower, Pole Structure 56
Grand Tower, IL 62942

Mailing Address:
P.O. Box 120, Eldorado, IL 62930

Union Status: Union

SIC:1623

NAICS: 0 


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 01/05/1987

Planning Guide: Safety-Construction

Emphasis:

Case Closed: 06/05/1987


Related Activity
Type Activity Nr Safety Health
Accident 360543896
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 2 1 3
Current Violations 2 1 3
Initial Penalty $1,450 $0 $0 $0 $0 $1,450
Current Penalty $1,450 $0 $0 $0 $0 $1,450
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19260950 D01 V 01/12/1987 01/15/1987 $640 $640 $0 I - Informal Settlement  
2. 01002A Serious 19260950 B01 01/12/1987 03/16/1987 $810 $810 $0 -  
3. 01002B Serious 19260952 A01 01/12/1987 01/20/1987 $0 $0 $0 -  
4. 02001 Other 19260021 B02 01/12/1987 03/16/1987 $0 $0 $0 -  

Investigation Summary

Investigation Nr: 14520647
Event: 12/17/1986
ELECTRIC SHOCK - CONTACT WITH OVERHEAD LINE THRU AERIAL LIFT

A LINEMAN WAS WORKING FROM AN AERIAL LIFT ON A 69-KILOVOLT OVERHEAD POWER LINE. THE BUCKET INSULATION WAS COMPROMISED BY A DRAIN HOLE CUT THROUGH THE OUTER INSULATION AND BY A DAMAGED INNER LINER. THE EMPLOYEE WAS WORKING IN THE BUCKET ABOVE THE ENERGIZED LINES IN AN AREA WHICH ALLOWED A 5-FOOT CLEARANCE. A GROUNDMAN ESTIMATED THE ACTUAL CLEARANCE BETWEEN THE BUCKET AND THE LINES TO BE 6 INCHES. THE EMPLOYEE WAS HOLDING THE GROUNDED, DEENERGIZED LINE WHEN THE BUCKET CONTACTED THE ENERGIZED CONDUCTOR BELOW. CURRENT PASSED THROUGH THE BUCKET, THROUGH THE BODY OF THE LINEMAN, AND OUT THROUGH THE GROUNDED DEENERGIZED LINES.

Keywords: OVERHEAD POWER LINE, ELECTRICAL, POWER LINE WORKER, ELECTROCUTED, E PTD, ELEC UTILITY WORK, AERIAL LIFT

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 2511319 Fatality Electric Shock Electrical power installers and repairers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.