Inspection Detail
Inspection: 18056515 - Harry S. Peterson Co., Inc.
Inspection Information - Office: Cincinnati Area Office
Site Address:
Harry S. Peterson Co., Inc.
Fifth And Vine St., Fountain Square Garage South
Cincinnati, OH 45202
Mailing Address:
4015 Executive Park Drive Suite 110, Cincinnati, OH 45241
Union Status: NonUnion
SIC:1799
NAICS: 0
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 08/06/1990
Planning Guide: Safety-Construction
Emphasis:
Case Closed: 10/05/1990
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 901041954 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 5 | 1 | 6 | |||
Current Violations | 4 | 2 | 6 | |||
Initial Penalty | $2,880 | $0 | $0 | $0 | $0 | $2,880 |
Current Penalty | $2,320 | $0 | $0 | $0 | $0 | $2,320 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Other | 19260059 E01 | 08/08/1990 | 09/08/1990 | $0 | $560 | $0 | I - Informal Settlement | ||
2. | 01002 | Serious | 19260151 A03 | 08/08/1990 | 08/11/1990 | $480 | $480 | $0 | I - Informal Settlement | ||
3. | 01003 | Serious | 19260152 A03 | 08/08/1990 | 08/11/1990 | $560 | $560 | $0 | I - Informal Settlement | ||
4. | 01004 | Serious | 19260152 E02 | 08/08/1990 | 08/15/1990 | $640 | $640 | $0 | I - Informal Settlement | ||
5. | 01005 | Serious | 19260152 F03 | 08/08/1990 | 08/11/1990 | $640 | $640 | $0 | I - Informal Settlement | ||
6. | 02001 | Other | 19260150 C01 VIII | 08/08/1990 | 09/08/1990 | $0 | $0 | $0 | I - Informal Settlement |
Investigation Summary
Employees #1 and #2 and two coworkers were resealing the floor of a parking garage. Two employees work together as a team to spray primer. One operates the leading end of a 50 ft spray hose connected to a barrel mounted on a cart that is pushed by the other employee. While grinding the floor, one of the two teams had exposed a live electrical wire housed in a metal pipe. An arc was produced and power was lost in the work area. When power was restored, the supervisor assumed that the wire was no longer electrified and the employees resumed working. One of the teams sprayed primer over the still-live electrical conduit. This produced an arc, a flame shot up, and the isopropyl in the primer ignited. A 60 ft by 90 ft fire was immediately suppressed by the emergency sprinkler system but not before intense heat melted all plastics in the area and charred the walls. A thick, dense black smoke was also produced. The employees evacuated the area. Employees #1 and #2 were sent to an emergency room and released after examination and treatment of smoke inhalation.
Keywords: ELECTRIC ARC, ISOPROPYL ALCOHOL, FLAMMABLE LIQUID, FIRE, CONSTRUCTION, SMOKE INHALATION, INATTENTION
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 18056515 | Non Hospitalized injury | Other | Occupation not reported | ||
2 | 18056515 | Non Hospitalized injury | Other | Occupation not reported |