Inspection Detail
Inspection: 1631496.015 - Ideker, Inc.
Inspection Information - Office: Kansas City Area Office
Site Address:
Ideker, Inc.
Mile Marker 169.4 Us Hwy 71, South Bound
Belton, MO 64012
Mailing Address:
4614 S 40th St., Saint Joseph, MO 64507
Union Status: Union
SIC:
NAICS: 237310/ Highway, Street, and Bridge Construction
Inspection Type: Fat/Cat
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 10/31/2022
Emphasis:
Case Closed: 04/13/2026
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 1962826 | ||
| Inspection | 1631583 | Yes | |
| Inspection | 1631502 | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 2 | 2 | ||||
| Current Violations | 2 | 2 | ||||
| Initial Penalty | $28,126 | $0 | $0 | $0 | $0 | $28,126 |
| Current Penalty | $19,688 | $0 | $0 | $0 | $0 | $19,688 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Serious | 5A0001 | 03/29/2023 | 04/24/2023 | $9,844 | $14,063 | $0 | I - Informal Settlement | ||
| 2. | 01002 | Serious | 19260021 B02 | 03/29/2023 | 04/24/2023 | $9,844 | $14,063 | $0 | I - Informal Settlement |
Investigation Summary
At 2:47 a.m. on October 29, 2022, an employee was sitting in the cab of the vehicle equipped with the truck-mounted attenuator when his truck was struck from behind by a Peterbilt Dump Truck hauling 35 tons of asphalt. The employee died due to blunt force trauma.
Keywords: Blunt force, Blunt force trauma, Dump Truck, Highway work zone, Road, Struck By
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 1631496.015 | 53 | M | Fatality |