Inspection Detail
Inspection: 1583264.015 - Wellspan York Hospital
Inspection Information - Office: Harrisburg Area Office
Site Address:
Wellspan York Hospital
1001 South George Street
York, PA 17403
Mailing Address:
1135 Edgar Street Attn: Aaron Gustkey, York, PA 17403
Union Status: NonUnion
SIC:
NAICS: 622110/General Medical and Surgical Hospitals
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 07/28/2022
Emphasis:
Case Closed: 01/17/2023
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Referral | 1868394 | Yes | |
| Inspection | 1583066 | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 1 | 1 | ||||
| Current Violations | 1 | 1 | ||||
| Initial Penalty | $11,188 | $0 | $0 | $0 | $0 | $11,188 |
| Current Penalty | $7,500 | $0 | $0 | $0 | $0 | $7,500 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001A | Serious | 19100147 C04 I | 08/08/2022 | 09/01/2022 | $0 | $11,188 | $0 | I - Informal Settlement | Citation has been deleted. | |
| 2. | 01001B | Serious | 19100147 C07 I A | 08/08/2022 | 09/01/2022 | $0 | $0 | $0 | I - Informal Settlement | Citation has been deleted. | |
| 3. | 01001C | Serious | 19100147 F03 II D | 08/08/2022 | 09/30/2022 | $7,500 | $0 | $0 | I - Informal Settlement |
Investigation Summary
While doing other work in the mechanical room that housed domestic water heaters 1 and 2, Employee #1 and Coworker #1 discovered a leak in domestic water heater 2. Instead of only repairing the leak in domestic water heater 2, a decision was made to also replace with new copper piping the old galvanized water piping, which supplied both water heaters. On the initial day of work, Coworker #1 shut off the steam and water to the two water heaters, drained the water from domestic water heater 2, and removed insulation on the water piping, as well as removed some of the water piping. On the second day of the work, at 7:50 a.m. on February 21, 2022, Coworker #1 went around the back of domestic water heater 1 in order to drain the water from this tank. In the meantime, Employee #2 (not involved in this project on the initial day of work), started yanking on the section of water piping attached to the side of domestic water heater 1. A valve on the water pipe broke, splashing hot water (160 degrees Fahrenheit) onto Employee #2, as well as onto Employee #1 standing behind Employee #2. Employee #2 experienced first and second degree burns to the chest, abdomen, left lower extremities, and right upper extremities, resulting in hospitalization.
Keywords: Abdomen, Burn, Chest, Hot Water, Splashed, Water Heater
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 1583264.015 | 58 | M | Hospitalized injury | Plumbers, pipefitters and steamfitters |