Inspection: 1543984.015 - Ameren Illinois Company
Inspection Information - Office: Fairview Heights Area Office
Site Address:
Ameren Illinois Company
1103 South Maple Street
Cambria, IL 62915
Mailing Address:
700 Oakwood Avenue, Alton, IL 62002
Union Status: Union
SIC:
NAICS: 221121/Electric Bulk Power Transmission and Control
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 10/29/2021
Emphasis:
Case Closed: 06/13/2023
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 1790214 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 3 | 3 | ||||
Current Violations | 1 | 1 | 2 | |||
Initial Penalty | $40,959 | $0 | $0 | $0 | $0 | $40,959 |
Current Penalty | $13,653 | $0 | $0 | $13,653 | $0 | $27,306 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19100269 C01 II | 11/17/2021 | 01/06/2022 | $0 | $13,653 | $0 | 12/13/2021 | F - Formal Settlement | Citation has been deleted. |
2. | 01002 | Other | 19100269 U06 I | 11/17/2021 | 05/19/2023 | $13,653 | $13,653 | $0 | 12/13/2021 | F - Formal Settlement | |
3. | 01003 | Serious | 19100269 M03 I | 11/17/2021 | 05/19/2023 | $13,653 | $13,653 | $0 | 12/13/2021 | F - Formal Settlement |
Investigation Summary
At 11:00 p.m. on July 23, 2021, Employee #1, working as part of a two-person crew, was attempting to remove a bolt securing the middle phase line on a 12 kV McGraw Edison Automatic Recloser Type "W" (serial Number 6005) inside the fenced electrical substation, approximately 50 feet by 50 feet. While applying an electrical drill, Employee #1 received an electrical shock from the energized recloser. The work occurred on a warm, dry night, and the employee was being trained under the supervision of a more experienced crew member. No coordination or briefing was conducted between Employee #1's crew and another three-person crew working nearby on 34 kV overhead lines to confirm hazard isolation procedures. Employee #1 sustained burns from the electrical shock and was transported to a hospital for admission and treatment.
Keywords: Burn, Electric Shock, Electrical, Electrical Burn, Electrical Work, Overhead Power Line, Shock
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1543984.015 | 52 | M | Hospitalized injury | Electricians |