Inspection Detail
Inspection: 1539931.015 - Ferrie Franzmann Industries, Llc
Inspection Information - Office: Dallas Area Office
Site Address:
Ferrie Franzmann Industries, Llc
1020 Sargent Rd
Dallas, TX 75235
Mailing Address:
1505 W 3rd Ave, Denver, CO 80223
Union Status: NonUnion
SIC:
NAICS: 221122/Electric Power Distribution
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 07/02/2021
Emphasis:
Case Closed: 12/01/2021
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 1782510 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 9 | 9 | ||||
Current Violations | 9 | 9 | ||||
Initial Penalty | $110,592 | $0 | $0 | $0 | $0 | $110,592 |
Current Penalty | $51,610 | $0 | $0 | $0 | $0 | $51,610 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19100269 A02 II E | 10/26/2021 | 11/22/2021 | $7,373 | $12,288 | $0 | I - Informal Settlement | ||
2. | 01002 | Serious | 19100269 A03 III | 10/26/2021 | 11/22/2021 | $0 | $12,288 | $0 | I - Informal Settlement | ||
3. | 01003 | Serious | 19100269 L01 III | 10/26/2021 | 11/22/2021 | $7,373 | $12,288 | $0 | I - Informal Settlement | ||
4. | 01004 | Serious | 19100269 M02 I | 10/26/2021 | 11/22/2021 | $7,373 | $12,288 | $0 | I - Informal Settlement | ||
5. | 01005 | Serious | 19100269 M03 II | 10/26/2021 | 11/22/2021 | $0 | $12,288 | $0 | I - Informal Settlement | ||
6. | 01006 | Serious | 19100269 U04 III | 10/26/2021 | 11/22/2021 | $7,373 | $12,288 | $0 | I - Informal Settlement | ||
7. | 01007 | Serious | 19100333 C02 | 10/26/2021 | 11/22/2021 | $7,373 | $12,288 | $0 | I - Informal Settlement | ||
8. | 01008 | Serious | 19100334 C03 | 10/26/2021 | 11/22/2021 | $7,373 | $12,288 | $0 | I - Informal Settlement | ||
9. | 01009 | Serious | 19100335 A01 I | 10/26/2021 | 11/22/2021 | $7,373 | $12,288 | $0 | I - Informal Settlement |
Investigation Summary
At 8:00 a.m. on June 29, 2021, Employee #1 and Employee #2, both working as electricians for an electrical power distributor, were preparing to install switchgear. The crew was testing for electrical power in the switchgear. One employee bypassed the shutters within the back of the electrical box in order to access the electrical contacts. The employee then used a digital multimeter to attempt to check for power. When the employee put the leads on the energized contacts an arc event occurred. Both employees were hospitalized to treat electrical burns to multiple parts of their bodies.
Keywords: Burn, Clothing, Contact, E GI IV (no lockout), Electric Arc, Electric Arc Flash, Electric Conductor, Electric Generator, Electrical, Electrical Box, Electrical Burn, Electrical Testing, Electrical Wire, Electrical Work, Electrician, Energized, Engineering Controls, Fire, Flame-Resistant Clothing (FRC), Flash, Inexperience, Installing, Lack of Engineering Controls, Lack of Work Procedures, Lockout, PPE, PPE Hazard Assessment, Protective Clothing, Safety Device, Switchgear, Unguarded, Unguarded Live Parts, Wrong Equipment
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1539931.015 | 30 | M | Hospitalized injury | Electrical and electronic technicians | |
2 | 1539931.015 | 30 | M | Hospitalized injury | Electrical and electronic technicians |