Inspection Detail
Inspection: 1516919.015 - Delek Us
Inspection Information - Office: Little Rock Area Office
Site Address:
Delek Us
1000 Mchenry Ave.
El Dorado, AR 71730
Mailing Address:
P. O. Box 7005, El Dorado, AR 71730
Union Status: Union
SIC:
NAICS: 324110/Petroleum Refineries
Inspection Type: Fat/Cat
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 03/01/2021
Emphasis: N:Chemnep
Case Closed: 08/11/2022
Type | Activity Nr | Safety | Health |
---|---|---|---|
Inspection | 1519553 | Yes | |
Referral | 1739994 | Yes | |
Accident | 1740834 | ||
Inspection | 1519563 | Yes | |
Inspection | 1519569 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 7 | 7 | ||||
Current Violations | 3 | 1 | 4 | |||
Initial Penalty | $99,473 | $0 | $0 | $0 | $0 | $99,473 |
Current Penalty | $40,959 | $0 | $0 | $13,653 | $0 | $54,612 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01004 | Serious | 19100119 F04 | 08/26/2021 | 03/15/2022 | $13,653 | $13,653 | $0 | 09/24/2021 | F - Formal Settlement | |
2. | 01005 | Serious | 19100119 H02 II | 08/26/2021 | 09/30/2021 | $0 | $13,653 | $0 | 09/24/2021 | F - Formal Settlement | Citation has been deleted. |
3. | 01007A | Serious | 19100119 L01 | 08/26/2021 | 09/30/2021 | $13,653 | $13,653 | $0 | 09/24/2021 | F - Formal Settlement | |
4. | 01007B | Serious | 19100119 L04 | 08/26/2021 | 03/15/2022 | $0 | $7,802 | $0 | 09/24/2021 | F - Formal Settlement | |
5. | 01007C | Serious | 19100119 I01 | 08/26/2021 | 03/15/2022 | $0 | $13,653 | $0 | 09/24/2021 | F - Formal Settlement | |
6. | 01009A | Serious | 19100106 C03 | 08/26/2021 | 03/15/2022 | $13,653 | $13,653 | $0 | 09/24/2021 | F - Formal Settlement | |
7. | 01009B | Serious | 19100106 C04 | 08/26/2021 | 03/15/2022 | $0 | $13,653 | $0 | 09/24/2021 | F - Formal Settlement | |
8. | 02001 | Other | 19100106 C07 | 08/26/2021 | 03/22/2022 | $13,653 | $9,753 | $0 | 09/24/2021 | F - Formal Settlement |
Investigation Summary
At 3:30 p.m. on February 27, 2021, a tractor trailer carrying a heat exchanger tube bundle attempted to cross a wooden ramp, meant to provide a temporary road crossing of Street A between Unit #6 and Unit #9 of the refinery. The ramp covered a two-inch threaded carbon steel pipe that connected the two units. The pipe was used to transfer sour Naphtha from Unit #9 manifold to Unit #6 LNHT stripper column. When employees attempted to use the temporary road crossing while moving the heat exchanger tube bundle, the piping was struck and displaced, resulting in the release of sour Naphtha, which ignited. Six employees were hospitalized for face and body burns.
Keywords: Bundle, Burn, Chemical, Chemical Burn, Chemical Exposure, Face, Heat Exchanger, Ignition, Metal Pipe, Naphtha, Ramp, Refinery, Road, Struck By, Torso, Tractor Trailer
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1516919.015 | 50 | M | Hospitalized injury | ||
2 | 1516919.015 | 25 | M | Hospitalized injury | Chemical technicians | |
3 | 1516919.015 | 30 | M | Hospitalized injury | ||
4 | 1516919.015 | 25 | M | Hospitalized injury | Chemical technicians | |
5 | 1516919.015 | 50 | M | Hospitalized injury | Chemical technicians | |
6 | 1516919.015 | 30 | M | Hospitalized injury | Chemical technicians |