Inspection Detail
Note: The following inspection has not been indicated as closed. OSHA citation items will be posted 30 (thirty) days after the employer receives the citation(s), except in cases of significant public interest. Posted citation items reflect any amendments to citations that are the result of a prompt settlement, which OSHA encourages. Employers and employee representatives will continue to receive copies of the citation(s) upon issuance.
Inspection: 1503269.015 - Jake Marshall, Llc
Inspection Information - Office: Tennessee Osha Chattanooga Office - Safety
Site Address:
Jake Marshall, Llc
553 Wacker Boulevard Nw
Charleston, TN 37310
Mailing Address:
2912 South Hickory Street, Chattanooga, TN 37407
Union Status: Union
SIC:
NAICS: 238220/ Plumbing, Heating, and Air-Conditioning Contractors
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 11/13/2020
Emphasis: N:Chemnep
Case Closed:
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Referral | 1691643 | Yes | |
| Inspection | 1503330 | Yes | |
| Inspection | 1504189 | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 1 | 1 | ||||
| Current Violations | 1 | 1 | ||||
| Initial Penalty | $2,400 | $0 | $0 | $0 | $0 | $2,400 |
| Current Penalty | $2,400 | $0 | $0 | $0 | $0 | $2,400 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Serious | TCA 50-3-105(1) | 03/29/2021 | 04/06/2021 | $2,400 | $2,400 | $0 | 04/19/2021 | C - Contested |
Investigation Summary
At 10:04 a.m. on November 13, 2020, Employee #1, employed by an industrial building construction company, was working at a multi-employer project, a chemical production plant. He was hot bolting a connection in an area of the plant where hydrochloric acid was being generated. A release of hydrochloric acid from a graphite nozzle connected to an AW234 heat exchanger occurred, and the employee sustained chemical burns. Employee #1 was transported to the hospital and admitted for treatment of hydrochloric acid burns to his right side underarm, buttocks, and leg.
Keywords: Bolt, Buttocks, Chemical Burn, Chemical Exposure, Construction, Heat Exchanger, Hydrochloric Acid, Leg, Torso
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 1503269.015 | 32 | M | Hospitalized injury | Plumbers, Pipefitters, & Steamfitters |