Inspection Detail
Inspection: 1497465.015 - All Phase Roofing
Inspection Information - Office: Mobile Area Office
Site Address:
All Phase Roofing
31094 River Rd.
Orange Beach, AL 36561
Mailing Address:
9375 Lakewood Dr, Semmes, AL 36575
Union Status: NonUnion
SIC:
NAICS: 238160/Roofing Contractors
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 12/14/2020
Emphasis: L:Fall
Case Closed: 03/14/2022
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Referral | 1671509 | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 2 | 2 | ||||
| Current Violations | 2 | 2 | ||||
| Initial Penalty | $0 | $0 | $0 | $2,892 | $0 | $2,892 |
| Current Penalty | $0 | $0 | $0 | $1,596 | $0 | $1,596 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Other | 19040039 A02 | 12/21/2020 | $1,596 | $2,892 | $0 | I - Informal Settlement | |||
| 2. | 01002 | Other | 19260503 B01 | 12/21/2020 | 01/11/2021 | $0 | $0 | $0 | I - Informal Settlement |
Investigation Summary
At 5:30 p.m. on October 6, 2020, an employee working for a roofing contractor was assisting a coworker on a residential roof installing weather shielding due to the start of a rain event. The employee is believed to have slipped causing him to fall. For unknown reasons, the employee had not attached his safety harness and lanyard to the provided rope on the roof. The employee was hospitalized to treat numerous blunt trauma injuries including his ribs, back, pelvis, and head.
Keywords: Back, Blunt force, Blunt force trauma, Chest, Concussion, Construction, Contusion, Fall, Fall From Elevation, Fall Protection, Harness, Head, Installing, Misjudgment, Misjudgment of Hazardous Situation, Neck, Pelvis, Residential Construction, Rib, Roof, Roofer, Slip, Slippery Surface, Weather, Work Surface
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 1497465.015 | 47 | M | Hospitalized injury |
Translate