Inspection Detail
Inspection: 1456529.015 - The Pullman Company
Inspection Information - Office: Toledo Area Office
Site Address:
The Pullman Company
11800 Ohio 424
Napoleon, OH 43545
Mailing Address:
11800 Ohio 424, Napoleon, OH 43545
Union Status: Union
SIC:
NAICS: 336330/Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 01/17/2020
Emphasis:
Case Closed: 08/14/2020
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 1534355 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 1 | 1 | ||||
Current Violations | 1 | 1 | ||||
Initial Penalty | $13,494 | $0 | $0 | $0 | $0 | $13,494 |
Current Penalty | $0 | $0 | $0 | $6,967 | $0 | $6,967 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001A | Other | 19100147 C07 I | 04/09/2020 | 05/31/2020 | $6,967 | $13,494 | $0 | I - Informal Settlement | ||
2. | 01001B | Serious | 19100147 D03 | 04/09/2020 | 05/31/2020 | $0 | $0 | $0 | I - Informal Settlement |
Investigation Summary
At 10:00 a.m. on January 14, 2020, a maintenance employee was closing a gate valve on the bottom of the pressurized DA tank for the company's boiler system, and 230 degree water at approximately 10 psi sprayed from the valve and splashed the employee in the upper body, causing first and second degree burns. The employee was hospitalized over night and released the next day.
Keywords: Boiler, Burn, Hot Water, Splashed, Sprayed, Torso
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1456529.015 | 50 | M | Hospitalized injury | Laborers, except construction |