Inspection Detail
Inspection: 1453337.015 - Abm Building Solutions, Llc.
Inspection Information - Office: Atlanta East Area Office
Site Address:
Abm Building Solutions, Llc.
1005 Winward Ridge Parkway
Alpharetta, GA 30005
Mailing Address:
1005 Winward Ridge Parkway, Alpharetta, GA 30005
Union Status: NonUnion
SIC:
NAICS: 238220/ Plumbing, Heating, and Air-Conditioning Contractors
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 12/31/2019
Emphasis: L:Fall
Case Closed: 04/13/2020
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Referral | 1530158 | Yes | |
| Inspection | 1460594 | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 1 | 1 | ||||
| Current Violations | 1 | 1 | ||||
| Initial Penalty | $9,447 | $0 | $0 | $0 | $0 | $9,447 |
| Current Penalty | $5,668 | $0 | $0 | $0 | $0 | $5,668 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Serious | 19100028 B03 I | 02/21/2020 | 03/18/2020 | $5,668 | $9,447 | $0 | I - Informal Settlement |
Investigation Summary
At 12:30 p.m. on December 27, 2019, an employee was on a roof fixing an HVAC unit when he fell through a skylight approximately 25 feet to the concrete surface. The employee was hospitalized to treat multiple fractures.
Keywords: Blunt force, Blunt force trauma, Concrete Surface, Fall, Fall From Elevation, Fracture, HVAC, Repair, Roof, Skylight
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 1453337.015 | 37 | M | Hospitalized injury | Electrical and electronic technicians |
Translate