Inspection Detail
Inspection: 1432892.015 - Big Creek Construction, Ltd
Inspection Information - Office: Austin Area Office
Site Address:
Big Creek Construction, Ltd
1207 Cr 105
Caldwell, TX 77836
Mailing Address:
1617 South Old Temple Rd, Lorena, TX 76655
Union Status: NonUnion
SIC:
NAICS: 324121/Asphalt Paving Mixture and Block Manufacturing
Inspection Type: Fat/Cat
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 10/09/2019
Emphasis:
Case Closed: 01/16/2020
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 1500753 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 2 | 2 | ||||
Current Violations | 2 | 2 | ||||
Initial Penalty | $0 | $0 | $0 | $3,790 | $0 | $3,790 |
Current Penalty | $0 | $0 | $0 | $2,274 | $0 | $2,274 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Other | 19040029 B01 | 12/04/2019 | 12/10/2019 | $1,137 | $1,895 | $0 | I - Informal Settlement | ||
2. | 01002 | Other | 19040030 A | 12/04/2019 | 12/10/2019 | $1,137 | $1,895 | $0 | I - Informal Settlement |
Investigation Summary
At 1:53 p.m. on September 19, 2019, an employee unloaded a load of D-rock gravel and was caught between the trailer and loader when the trailer was backed up. The employee was killed.
Keywords: Backing Up, Caught Between, Loader, Pinned, Trailer
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1432892.015 | 58 | M | Fatality | Truck drivers, heavy |