Inspection Detail
Inspection: 1431599.015 - Good Hope Contracting Co., Inc.
Inspection Information - Office: Birmingham Area Office
Site Address:
Good Hope Contracting Co., Inc.
9091 Us Highway 11 N
Attalla, AL 35954
Mailing Address:
3280 County Road 437, Cullman, AL 35057
Union Status: NonUnion
SIC:
NAICS: 324121/Asphalt Paving Mixture and Block Manufacturing
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 09/17/2019
Emphasis:
Case Closed: 09/02/2020
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 1497163 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 3 | 1 | 2 | 6 | ||
Current Violations | 2 | 1 | 2 | 5 | ||
Initial Penalty | $26,254 | $0 | $22,505 | $1,876 | $0 | $50,635 |
Current Penalty | $12,318 | $0 | $12,000 | $1,000 | $0 | $25,318 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001A | Serious | 19100132 A | 01/07/2020 | $7,500 | $11,252 | $0 | I - Informal Settlement | |||
2. | 01001B | Serious | 19100132 F01 | 01/07/2020 | $0 | $0 | $0 | I - Informal Settlement | |||
3. | 01002 | Serious | 19100151 B | 01/07/2020 | $4,818 | $7,501 | $0 | I - Informal Settlement | |||
4. | 01003 | Serious | 19100151 C | 01/07/2020 | $0 | $7,501 | $0 | I - Informal Settlement | Citation has been deleted. | ||
5. | 02001 | Repeat | 19100132 D01 | 01/07/2020 | $12,000 | $22,505 | $0 | I - Informal Settlement | |||
6. | 03001A | Other | 19040029 B02 | 01/07/2020 | 02/03/2020 | $1,000 | $1,876 | $0 | I - Informal Settlement | ||
7. | 03001B | Other | 19040029 B03 | 01/07/2020 | 02/03/2020 | $0 | $0 | $0 | I - Informal Settlement | ||
8. | 03002 | Other | 19101200 G01 | 01/07/2020 | $0 | $0 | $0 | I - Informal Settlement |
Investigation Summary
At 5:00 p.m. on September 10, 2019, an employee was preparing to flush residual liquid asphalt out of a 4 in. hose by pushing diesel fuel into the and out of a 1 in. hose. The employee discussed concern that the process would have clogged the 1 in. hose with a coworker, the operator. While discussing potential solutions to avoid clogging the hose, there was confusion over what hose would be removed. Residual hot AC in the hose was under pressure and sprayed the employee's entire right side. The employee suffered burns to both arms, elbows, hands, and small spots on the face, resulting in hospitalization.
Keywords: Arm, Asphalt, Burn, Elbow, Face, Hand, Heat, Hot Asphalt, Sprayed
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1431599.015 | 70 | M | Hospitalized injury | Truck drivers, light |