Inspection Detail
Inspection: 1422321.015 - Entech Sales And Service Llc
Inspection Information - Office: San Antonio Area Office
Site Address:
Entech Sales And Service Llc
8202 Sand Pebble
San Antonio, TX 78250
Mailing Address:
8202 Sand Pebble, San Antonio, TX 78250
Union Status: NonUnion
SIC:
NAICS: 811310/Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
Inspection Type: Referral
Scope: Partial
Advanced Notice: Y
Ownership: Private
Safety/Health: Safety
Close Conference: 08/08/2019
Emphasis:
Case Closed: 01/31/2020
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 1506001 | Yes | |
Inspection | 1421845 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 4 | 4 | ||||
Current Violations | 4 | 4 | ||||
Initial Penalty | $45,464 | $0 | $0 | $0 | $0 | $45,464 |
Current Penalty | $24,000 | $0 | $0 | $0 | $0 | $24,000 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19100332 B01 | 12/26/2019 | 01/10/2020 | $7,000 | $11,366 | $0 | I - Informal Settlement | ||
2. | 01002 | Serious | 19100333 B02 | 12/26/2019 | 01/10/2020 | $7,000 | $11,366 | $0 | I - Informal Settlement | ||
3. | 01003A | Serious | 19100335 A01 I | 12/26/2019 | 01/10/2020 | $5,000 | $11,366 | $0 | I - Informal Settlement | ||
4. | 01003B | Serious | 19100335 A01 V | 12/26/2019 | 01/10/2020 | $0 | $0 | $0 | I - Informal Settlement | ||
5. | 01004 | Serious | 19100335 A02 I | 12/26/2019 | 01/15/2020 | $5,000 | $11,366 | $0 | I - Informal Settlement |
Investigation Summary
At 10:45 p.m. on August 7, 2019, Employee #1 was attempting to preform a load bank test to the building's automatic transfer switch panel connected to the back-up generator, by connecting the load bank test wires. An arc flash incident occurred, resulting in third degree burns to Employee #1 and Employee #2. The arc flash occurred as a result of not ensuring effective lockout/tagout completed prior to performing the load bank test on the generator. Neither employee had donned the appropriate arc flash PPE. Employee #1 sustained third degree burns to his hands, neck, face, ears, and upper arms requiring extended hospital treatment in the burn unit. Employee #2 sustained third degree burns to his hands, arms and forearms, and parts of the neck and face, as well as multiple strokes from the arc flash incident.
Keywords: Arm, Burn, Ear, Electric Arc, Electric Arc Flash, Electrical Burn, Face, Hand, Lockout, Lockout/Tagout, Neck, Stroke
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1422321.015 | 48 | M | Hospitalized injury | ||
2 | 1422321.015 | 21 | M | Hospitalized injury | Helpers, mechanics and repairers |