Inspection Detail
Inspection: 1413163.015 - Par Electrical Contractors, Inc.
Inspection Information - Office: Kansas City Area Office
Site Address:
Par Electrical Contractors, Inc.
6760 W. Farm Road 68
Willard, MO 65781
Mailing Address:
4470 N. Belleview Ave, #300, Kansas City, MO 64116
Union Status: Union
SIC:
NAICS: 238210/Electrical Contractors
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 07/05/2019
Emphasis: L:Xfallelec
Case Closed: 11/19/2021
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 1472416 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 8 | 1 | 9 | |||
Current Violations | 4 | 4 | ||||
Initial Penalty | $90,926 | $0 | $0 | $1,895 | $0 | $92,821 |
Current Penalty | $0 | $0 | $0 | $53,040 | $0 | $53,040 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Other | 19040029 B03 | 10/24/2019 | 11/08/2021 | $13,260 | $1,895 | $0 | 11/14/2019 | F - Formal Settlement | |
2. | 01002 | Other | 19260050 D02 | 10/24/2019 | 11/08/2021 | $13,260 | $5,683 | $0 | 11/14/2019 | F - Formal Settlement | |
3. | 01003 | Other | 19260150 A04 | 10/24/2019 | 11/08/2021 | $13,260 | $5,683 | $0 | 11/14/2019 | F - Formal Settlement | |
4. | 01004 | Serious | 19260959 D02 | 10/24/2019 | 11/20/2019 | $0 | $13,260 | $0 | 11/14/2019 | F - Formal Settlement | Citation has been deleted. |
5. | 01005 | Other | 19260960 B02 | 10/24/2019 | 11/08/2021 | $13,260 | $13,260 | $0 | 11/14/2019 | F - Formal Settlement | |
6. | 01006 | Serious | 19260960 C01 III | 10/24/2019 | 11/20/2019 | $0 | $13,260 | $0 | 11/14/2019 | F - Formal Settlement | Citation has been deleted. |
7. | 01007 | Serious | 19260960 E03 | 10/24/2019 | 11/20/2019 | $0 | $13,260 | $0 | 11/14/2019 | F - Formal Settlement | Citation has been deleted. |
8. | 01008 | Serious | 19260964 B01 | 10/24/2019 | 11/20/2019 | $0 | $13,260 | $0 | 11/14/2019 | F - Formal Settlement | Citation has been deleted. |
9. | 01009 | Serious | 19260964 B03 | 10/24/2019 | 11/20/2019 | $0 | $13,260 | $0 | 11/14/2019 | F - Formal Settlement | Citation has been deleted. |
Investigation Summary
At 10:45 a.m. on July 3, 2019, Employees #1 and #2, employed by an electrical contractor, were moving a service line higher up an existing utility pole. They were working from a bucket truck when the service line came into contact with another utility's energized power lines. Both employees were shocked and burned by the high voltage. They were transported to the hospital and admitted for treatment of electric shock and electrical burns.
Keywords: Boom Truck, Construction, Contact, Electric Shock, Electrical Burn, Energized, High Voltage, Lift Bucket, Maintenance, Power Lines, Rehabilitation
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1413163.015 | 30 | M | Hospitalized injury | Electrical power installers and repairers | |
2 | 1413163.015 | 30 | M | Hospitalized injury | Electrical power installers and repairers |