Inspection Detail
Inspection: 1402155.015 - Jbl Electric, Inc.
Inspection Information - Office: Marlton Area Office
Site Address:
Jbl Electric, Inc.
Newman Springs Road & Gsp Exit 109 North Entranceway
Lincroft, NJ 07738
Mailing Address:
3001 South Clinton Avenue, South Plainfield, NJ 07080
Union Status: Union
SIC:
NAICS: 238210/Electrical Contractors
Inspection Type: Referral
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 05/21/2019
Emphasis:
Case Closed: 08/25/2022
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 1457108 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 7 | 7 | ||||
Current Violations | 2 | 2 | ||||
Initial Penalty | $83,538 | $0 | $0 | $0 | $0 | $83,538 |
Current Penalty | $0 | $0 | $0 | $30,000 | $0 | $30,000 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Other | 19260021 B02 | 11/18/2019 | 11/22/2019 | $15,000 | $11,934 | $0 | 12/12/2019 | J - ALJ Decision | |
2. | 01002 | Other | 19260028 A | 11/18/2019 | 11/22/2019 | $15,000 | $11,934 | $0 | 12/12/2019 | J - ALJ Decision | |
3. | 01003 | Serious | 19260964 B01 | 11/18/2019 | 11/22/2019 | $0 | $11,934 | $0 | 12/12/2019 | J - ALJ Decision | Citation has been deleted. |
4. | 01004 | Serious | 19260964 B02 | 11/18/2019 | 11/22/2019 | $0 | $11,934 | $0 | 12/12/2019 | J - ALJ Decision | Citation has been deleted. |
5. | 01005 | Serious | 19260964 B04 I | 11/18/2019 | 11/22/2019 | $0 | $11,934 | $0 | 12/12/2019 | J - ALJ Decision | Citation has been deleted. |
6. | 01006 | Serious | 19260964 B05 | 11/18/2019 | 11/22/2019 | $0 | $11,934 | $0 | 12/12/2019 | J - ALJ Decision | Citation has been deleted. |
7. | 01007 | Serious | 19260964 B09 | 11/18/2019 | 11/22/2019 | $0 | $11,934 | $0 | 12/12/2019 | J - ALJ Decision | Citation has been deleted. |
Investigation Summary
At 11:15 a.m. on May 20, 2019, Employees #1 and #2, employed by an electrical contractor, were pulling a .25-inch steel strand messenger cable from one pole to the next. The messenger cable contacted an adjacent, drooping power line. Both employees were shocked and sustained third degree burns, with Employee #1's burns requiring skin grafting.
Keywords: Burn, Cable, Contact, Elec Utility Work, Electric Shock, Electrical Work, Energized, Installing, Overhead Power Line, Skin, Steel, Utility Pole
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1402155.015 | 52 | M | Hospitalized injury | Occupation Not Listed |