Inspection Detail

Case Status: CLOSED

Inspection: 1402155.015 - Jbl Electric, Inc.

Inspection Information - Office: Marlton Area Office

 

Inspection Nr: 1402155.015
Report ID: 0213900
Date Opened: 05/20/2019

Site Address:
Jbl Electric, Inc.
Newman Springs Road & Gsp Exit 109 North Entranceway
Lincroft, NJ 07738

Mailing Address:
3001 South Clinton Avenue, South Plainfield, NJ 07080

Union Status: Union

SIC:

NAICS: 238210/Electrical Contractors


Inspection Type: Referral

Scope: Complete

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 05/21/2019

Emphasis:

Case Closed: 08/25/2022


Related Activity
Type Activity Nr Safety Health
Referral 1457108 Yes
Case Status: CLOSED
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 7 7
Current Violations 2 2
Initial Penalty $83,538 $0 $0 $0 $0 $83,538
Current Penalty $0 $0 $0 $30,000 $0 $30,000
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Other 19260021 B02 11/18/2019 11/22/2019 $15,000 $11,934 $0 12/12/2019 J - ALJ Decision  
2. 01002 Other 19260028 A 11/18/2019 11/22/2019 $15,000 $11,934 $0 12/12/2019 J - ALJ Decision  
3. 01003 Serious 19260964 B01 11/18/2019 11/22/2019 $0 $11,934 $0 12/12/2019 J - ALJ Decision Citation has been deleted.
4. 01004 Serious 19260964 B02 11/18/2019 11/22/2019 $0 $11,934 $0 12/12/2019 J - ALJ Decision Citation has been deleted.
5. 01005 Serious 19260964 B04 I 11/18/2019 11/22/2019 $0 $11,934 $0 12/12/2019 J - ALJ Decision Citation has been deleted.
6. 01006 Serious 19260964 B05 11/18/2019 11/22/2019 $0 $11,934 $0 12/12/2019 J - ALJ Decision Citation has been deleted.
7. 01007 Serious 19260964 B09 11/18/2019 11/22/2019 $0 $11,934 $0 12/12/2019 J - ALJ Decision Citation has been deleted.

Investigation Summary

Investigation Nr: 116408.015
Event: 05/20/2019
Two employees are burned and shocked during messenger cable

At 11:15 a.m. on May 20, 2019, Employees #1 and #2, employed by an electrical contractor, were pulling a .25-inch steel strand messenger cable from one pole to the next. The messenger cable contacted an adjacent, drooping power line. Both employees were shocked and sustained third degree burns, with Employee #1's burns requiring skin grafting.

Keywords: Burn, Cable, Contact, Elec Utility Work, Electric Shock, Electrical Work, Energized, Installing, Overhead Power Line, Skin, Steel, Utility Pole

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 1402155.015 52 M Hospitalized injury Occupation Not Listed
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.