Inspection Detail
Inspection: 1366525.015 - Fullford Electric, Inc
Inspection Information - Office: Alaska Department Of Labor Osh Enforcement
Site Address:
Fullford Electric, Inc
Richardson Highway Mile Post 362.944
Fairbanks, AK 99701
Mailing Address:
303 E Van Horn Rd., Fairbanks, AK 99701
Union Status: Union
SIC:
NAICS: 238210/Electrical Contractors
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 03/14/2019
Emphasis: N:Amputate, S:Construction
Case Closed: 09/25/2019
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Referral | 1409613 | Yes | |
| Inspection | 1371313 | Yes |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 2 | 2 | 4 | |||
| Current Violations | 2 | 2 | 4 | |||
| Initial Penalty | $14,000 | $0 | $0 | $2,000 | $0 | $16,000 |
| Current Penalty | $9,800 | $0 | $0 | $700 | $0 | $10,500 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Serious | 19260960 C01 III C | 05/29/2019 | $4,900 | $7,000 | $0 | I - Informal Settlement | |||
| 2. | 01002 | Serious | 19260964 B04 II | 05/29/2019 | 06/04/2019 | $4,900 | $7,000 | $0 | I - Informal Settlement | ||
| 3. | 02001 | Other | AS 18.60.058 (A) | 05/29/2019 | 06/04/2019 | $700 | $1,000 | $0 | I - Informal Settlement | ||
| 4. | 02002 | Other | 19260021 B02 | 05/29/2019 | 07/16/2019 | $0 | $1,000 | $0 | I - Informal Settlement |
Investigation Summary
At 4:30 p.m. on December 14, 2018, an employee climbed a utility pole to install powerline upgrade. As the employee ascended the pole, the employee made contact with a live, high voltage powerline and received severe electrical burns. The employee was transported to a local hospital where the employee's right arm was amputated due to the severity of the burns.
Keywords: Amputated, Arm, Ascending, Climbing, Contact, Elec Utility Work, Electric Shock, Electric current, Electrical Work, Overhead Power Line, Power Line Worker, Utility Pole
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 1366525.015 | 42 | M | Hospitalized injury | Electrical Power-Line |
Translate