Inspection Detail
Inspection: 1359230.015 - Delta Plastics Of The South, Llc
Inspection Information - Office: Fremont District Office
Site Address:
Delta Plastics Of The South, Llc
340 El Camino Real
Salinas, CA 93901
Mailing Address:
3840 E. 26th St., Vernon, CA 90058
Union Status: NonUnion
SIC:
NAICS: 562920/Materials Recovery Facilities
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 04/22/2019
Emphasis:
Case Closed: 06/03/2019
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 1399097 |
| Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
|---|---|---|---|---|---|---|
| Initial Violations | 1 | 5 | 6 | |||
| Current Violations | 1 | 5 | 6 | |||
| Initial Penalty | $18,000 | $0 | $0 | $3,375 | $0 | $21,375 |
| Current Penalty | $18,000 | $0 | $0 | $3,375 | $0 | $21,375 |
| FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
| # | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1. | 01001 | Other | 3203(B)(2) | 04/24/2019 | $375 | $375 | $0 | Z - Issued | |||
| 2. | 01002 | Other | 3203(A)(4)(B) | 04/24/2019 | $750 | $750 | $0 | Z - Issued | |||
| 3. | 01003 | Other | 3314(G)(2)(A) | 04/24/2019 | $750 | $750 | $0 | Z - Issued | |||
| 4. | 01004 | Other | 3314(L)(1) | 04/24/2019 | $750 | $750 | $0 | Z - Issued | |||
| 5. | 01005 | Other | 3328(G) | 04/24/2019 | $750 | $750 | $0 | Z - Issued | |||
| 6. | 02001 | Serious | 3314(C) | 04/24/2019 | $18,000 | $18,000 | $0 | Z - Issued |
Investigation Summary
At 12:45 p.m. on November 6, 2018, Employee #1 was working on the Davis Standard Line that was giving low water alarms. The employee and his foreman turned off the water flow and cleared the piping, and then turned the water back on. They received the same alarm, so they went to the Gala Pellet dryer, Serial number 10901226, and Model number TWS-200, to try to unclog the plastic buildup. The foreman opened the dryer door and they saw the clog. The foreman could not reach all of the clog, so the employee reached in. His hand hit the blade that cuts the plastic and sustained amputations of his index finger and thumb, severe lacerations to his ring and middle finger, and multiple fractures to the little finger on the right hand. The employee was hospitalized for treatment.
Keywords: Amputated, Amputation, Blade, Clogged, Finger, Fracture, Laceration, Lockout, Thumb, Water
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 1359230.015 | 52 | M | Hospitalized injury | Machinery maintenance occupations |