Inspection Detail
Inspection: 1322701.015 - Fluid Delivery Solutions, Llc
Inspection Information - Office: Lubbock Area Office
Site Address:
Fluid Delivery Solutions, Llc
Windham Ii
Midland, TX 79706
Mailing Address:
6795 Corporate Ste 200, Fort Worth, TX 76126
Union Status: NonUnion
SIC:
NAICS: 213112/Support Activities for Oil and Gas Operations
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 06/14/2018
Emphasis: L:Oilgas
Case Closed: 08/15/2018
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Referral | 1347211 | Yes |
Investigation Summary
At 4:15 p.m. on June 11, 2018, an employee was placing a clamp onto a water line and the system failed. The employee was struck by a portion of the pipeline as the pressure was released and fractured his tibia. The employee was hospitalized.
Keywords: Fracture, Leg, Pipeline, Plumbing, Struck By, Tibia
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 1322701.015 | 34 | M | Hospitalized injury | Laborers, except construction |
Translate