Inspection Detail

Case Status: CLOSED

Inspection: 1305883.015 - Day & Zimmermann Nps, Inc.

Inspection Information - Office: Nashville Area Office

 

Inspection Nr: 1305883.015
Report ID: 0420100
Date Opened: 03/22/2018

Site Address:
Day & Zimmermann Nps, Inc.
2440 Igou Ferry Rd
Soddy Daisy, TN 37379

Mailing Address:
1101 Market Street Br 2b, Chattanooga, TN 37402

Union Status: Union

SIC:

NAICS: 238210/Electrical Contractors


Inspection Type: Unprog Rel

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 03/23/2018

Emphasis:

Case Closed: 02/14/2020


Related Activity
Type Activity Nr Safety Health
Inspection 1305872 Yes
Case Status: CLOSED
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 6 6
Current Violations 3 3
Initial Penalty $71,599 $0 $0 $0 $0 $71,599
Current Penalty $0 $0 $0 $32,797 $0 $32,797
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 19100269 B01 II 07/31/2018 08/17/2018 $0 $12,934 $0 08/24/2018 F - Formal Settlement Citation has been deleted.
2. 01002 Serious 19100269 C02 07/31/2018 08/06/2018 $0 $12,934 $0 08/24/2018 F - Formal Settlement Citation has been deleted.
3. 01003 Serious 19100269 C03 II 07/31/2018 08/06/2018 $0 $12,934 $0 08/24/2018 F - Formal Settlement Citation has been deleted.
4. 01004 Other 19100269 D06 VI 07/31/2018 08/06/2018 $6,929 $6,929 $0 08/24/2018 F - Formal Settlement  
5. 01005 Other 19100269 L03 III 07/31/2018 08/06/2018 $12,934 $12,934 $0 08/24/2018 F - Formal Settlement  
6. 01006 Other 19100269 L08 V 07/31/2018 08/06/2018 $12,934 $12,934 $0 08/24/2018 F - Formal Settlement  

Investigation Summary

Investigation Nr: 107169.015
Event: 03/16/2018
Two employees inspecting switchgear are burned in arc flash

At 3:15 p.m. on March 16, 2018, Employees #1 and #2, employed by a construction company, were inspecting a 6.9 kilovolt switchgear compartment at a multiemployer construction project. An arc flash occurred, and both employees were burned. Emergency services were called, and Employees #1 and #2 were transported to the hospital and admitted. Employee #1 was treated for second and third degree burns to his arm, hand, and chest, and first and second degree burns to his face. Employee #2 was treated for second and third degree burns to his face and arms.

Keywords: Arm, Burn, Chest, Construction, Electric Arc, Electrical Cabinet, Electrical Testing, Face, Hand, Switchgear

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 1305883.015 29 M Hospitalized injury Electricians
2 1305883.015 33 M Hospitalized injury Electricians
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.