Powered by GoogleTranslate

Inspection Detail

Case Status: CLOSED

Inspection: 1283916.015 - Green Recycling Llc

Inspection Information - Office: Hi-E-Honolulu

 

Inspection Nr: 1283916.015
Report ID: 0951510
Date Opened: 12/18/2017

Site Address:
Green Recycling Llc
91-080 Hanua Street
Kapolei, HI 96707

Mailing Address:
91-080 Hanua Street, Kapolei, HI 96707

Union Status: NonUnion

SIC:

NAICS: 423930/Recyclable Material Merchant Wholesalers


Inspection Type: Referral

Scope: Complete

Advanced Notice: N

Ownership: Private

Safety/Health: Safety

Close Conference: 12/18/2017

Emphasis:

Case Closed: 05/02/2019


Related Activity
Type Activity Nr Safety Health
Referral 1294046 Yes
Case Status: CLOSED
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 5 2 7
Current Violations 5 2 7
Initial Penalty $9,200 $0 $0 $0 $0 $9,200
Current Penalty $6,440 $0 $0 $0 $0 $6,440
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Cited Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Serious 12-60-2(B)(2)(A)(II) 02/26/2018 03/16/2018 $1,680 $2,400 $0 I - Informal Settlement  
2. 01002A Serious 12-60-2(B)(3) 02/26/2018 04/02/2018 $1,120 $1,600 $0 I - Informal Settlement  
3. 01002B Serious 12-60-2(B)(4)(C) 02/26/2018 04/02/2018 $0 $0 $0 I - Informal Settlement  
4. 01003 Serious 19100151 C 02/26/2018 04/02/2018 $1,120 $1,600 $0 I - Informal Settlement  
5. 01004 Serious 19100178 P01 02/26/2018 04/02/2018 $1,120 $1,600 $0 I - Informal Settlement  
6. 01005 Serious 19100304 G05 02/26/2018 $1,400 $2,000 $0 I - Informal Settlement  
7. 02001 Other 19100178 L06 02/26/2018 04/02/2018 $0 $0 $0 I - Informal Settlement  
8. 02002 Other 19100132 D02 02/26/2018 04/02/2018 $0 $0 $0 I - Informal Settlement  

Investigation Summary

Investigation Nr: 101605.015
Event: 12/18/2017
Employee receives first and second degree gasoline burns

On December 18, 2017, Employee #1 was salvaging plastic gas tank from a wrecked car held up by forklift. Employee #1 pierced a plastic gas tank to drain gasoline into a bucket. Employee #1 spilled gasoline and it ignited. The employee sustained first degree burns to his left shin and left forearm and second degree burns to left side of his face. The employee was released from the hospital the same day.

Keywords: Burn, Face, Forearm, Gas, Gasoline, Leg, Spill

Investigated Inspection
# Inspection Age Sex Degree of Injury Nature of Injury Occupation
1 1283916.015 50 M Non Hospitalized injury Automobile body and related repairers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close