Inspection Detail
Inspection: 1274028.015 - Benchmark Construction Co., Inc.
Inspection Information - Office: Chicago North
Site Address:
Benchmark Construction Co., Inc.
South Park Blvd & Parkside Cir.
Streamwood, IL 60107
Mailing Address:
2260 Southwind Blvd., Bartlett, IL 60103
Union Status: Union
SIC:
NAICS: 237110/Water and Sewer Line and Related Structures Construction
Inspection Type: Fat/Cat
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 10/25/2017
Emphasis:
Case Closed: 11/19/2018
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 1278287 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 6 | 6 | ||||
Current Violations | 6 | 6 | ||||
Initial Penalty | $77,604 | $0 | $0 | $0 | $0 | $77,604 |
Current Penalty | $55,000 | $0 | $0 | $0 | $0 | $55,000 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001A | Serious | 19260055 A | 04/23/2018 | 07/23/2018 | $9,200 | $12,934 | $0 | 05/30/2018 | F - Formal Settlement | |
2. | 01001B | Serious | 19260055 B | 04/23/2018 | 07/23/2018 | $0 | $0 | $0 | 05/30/2018 | F - Formal Settlement | |
3. | 01001C | Serious | 19261204 D01 | 04/23/2018 | 04/27/2018 | $0 | $0 | $0 | 05/30/2018 | F - Formal Settlement | |
4. | 01001D | Serious | 19261204 E01 | 04/23/2018 | 04/27/2018 | $0 | $0 | $0 | 05/30/2018 | F - Formal Settlement | |
5. | 01002 | Serious | 19261204 B | 04/23/2018 | 04/27/2018 | $9,000 | $12,934 | $0 | 05/30/2018 | F - Formal Settlement | |
6. | 01003A | Serious | 19261204 D08 | 04/23/2018 | 04/27/2018 | $9,200 | $12,934 | $0 | 05/30/2018 | F - Formal Settlement | |
7. | 01003B | Serious | 19261211 C01 | 04/23/2018 | 04/27/2018 | $0 | $0 | $0 | 05/30/2018 | F - Formal Settlement | |
8. | 01004 | Serious | 19261206 H | 04/23/2018 | 04/27/2018 | $9,200 | $12,934 | $0 | 05/30/2018 | F - Formal Settlement | |
9. | 01005A | Serious | 19261207 A | 04/23/2018 | 07/23/2018 | $9,200 | $12,934 | $0 | 05/30/2018 | F - Formal Settlement | |
10. | 01005B | Serious | 19261208 A | 04/23/2018 | 05/24/2018 | $0 | $0 | $0 | 05/30/2018 | F - Formal Settlement | |
11. | 01005C | Serious | 19261209 A | 04/23/2018 | 05/24/2018 | $0 | $0 | $0 | 05/30/2018 | F - Formal Settlement | |
12. | 01005D | Serious | 19261210 A | 04/23/2018 | 05/24/2018 | $0 | $0 | $0 | 05/30/2018 | F - Formal Settlement | |
13. | 01006A | Serious | 19261210 D | 04/23/2018 | 04/27/2018 | $9,200 | $12,934 | $0 | 05/30/2018 | F - Formal Settlement | |
14. | 01006B | Serious | 19261211 A01 | 04/23/2018 | 04/27/2018 | $0 | $0 | $0 | 05/30/2018 | F - Formal Settlement | |
15. | 01006C | Serious | 19261211 A02 | 04/23/2018 | 04/27/2018 | $0 | $0 | $0 | 05/30/2018 | F - Formal Settlement |
Investigation Summary
At 6:30 p.m. on October 25, 2017, an employee was working with a crew that was engaged in sewer line rehabilitation work using a cured-in-place-pipe (CIPP). The CIPP process is a trenchless method for the sewer pipe repair which involves a resin-impregnated fiberglass liner inverted into the damaged sewer pipe. The employee crawled into a 24 inch horizontal sewer line and was in approximately 30 feet, cutting ropes and lying flat hot water circulation hoses. The employee began to mumble and became unresponsive. Emergency Services responded and the employee's body was recovered by the Fire Department Rescue Team and the employee was pronounced at the scene. Drowning with styrene toxicity was listed as a significant contributing factor.
Keywords:confined space, oxygen, styrene, toxic atmosphere, toxic fumes
# | Inspection | Age | Sex | Degree | Nature | Occupation |
---|---|---|---|---|---|---|
1 | 1274028.015 | Fatality |