Inspection Detail
Inspection: 1263304.015 - Cherry-Todd Electric Cooperative
Inspection Information - Office: Sioux Falls Area Office
Site Address:
Cherry-Todd Electric Cooperative
295th Street And 272nd Avenue
Mission, SD 57555
Mailing Address:
P.O. Box 169, Mission, SD 57555
Union Status: Union
SIC:
NAICS: 221122/Electric Power Distribution
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 10/10/2017
Emphasis:
Case Closed: 10/01/2017
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 1263025 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 10 | 10 | ||||
Current Violations | 9 | 9 | ||||
Initial Penalty | $44,350 | $0 | $0 | $0 | $0 | $44,350 |
Current Penalty | $30,000 | $0 | $0 | $0 | $0 | $30,000 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19100133 A01 | 01/08/2018 | 02/02/2018 | $3,000 | $3,696 | $0 | I - Informal Settlement | ||
2. | 01002 | Serious | 19100135 A01 | 01/08/2018 | 02/02/2018 | $3,000 | $3,696 | $0 | I - Informal Settlement | ||
3. | 01003 | Serious | 19100138 A | 01/08/2018 | 02/02/2018 | $3,000 | $5,174 | $0 | I - Informal Settlement | ||
4. | 01004 | Serious | 19100269 A02 II | 01/08/2018 | 02/02/2018 | $0 | $3,696 | $0 | I - Informal Settlement | Citation has been deleted. | |
5. | 01005 | Serious | 19100269 C01 II | 01/08/2018 | 02/02/2018 | $3,000 | $3,696 | $0 | I - Informal Settlement | ||
6. | 01006 | Serious | 19100269 G02 IV C 1 | 01/08/2018 | 02/02/2018 | $3,000 | $3,696 | $0 | I - Informal Settlement | ||
7. | 01007A | Serious | 19100269 L03 III | 01/08/2018 | 02/02/2018 | $4,000 | $5,174 | $0 | I - Informal Settlement | ||
8. | 01007B | Serious | 19100269 L05 II | 01/08/2018 | 02/02/2018 | $0 | $0 | $0 | I - Informal Settlement | ||
9. | 01008 | Serious | 19100269 L08 III | 01/08/2018 | 02/02/2018 | $5,000 | $5,174 | $0 | I - Informal Settlement | ||
10. | 01009A | Serious | 19100269 M03 II | 01/08/2018 | 02/02/2018 | $3,000 | $5,174 | $0 | I - Informal Settlement | ||
11. | 01009B | Serious | 19100269 M03 VI | 01/08/2018 | 02/02/2018 | $0 | $0 | $0 | I - Informal Settlement | ||
12. | 01010 | Serious | 19100269 N03 | 01/08/2018 | 02/02/2018 | $3,000 | $5,174 | $0 | I - Informal Settlement |
Investigation Summary
At 10:00 p.m. on September 9, 2017, an employee was working from a bucket truck to relocate energized electrical wires in preparation for installing a new electrical pole. During work, he contacted a 14.4 kV conductor and sustained shock and burns, which he was hospitalized and received treatment.
Keywords: Burn, Electrical, Electrical Work, Shock
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1263304.015 | 34 | M | Hospitalized injury | Electrical power installers and repairers |