Case Status: CLOSED

Inspection: 1260716.015 - Hb Parkco Construction, Inc.; Parkco Building Company

Inspection Information - Office: Ca Santa Ana District Office

 

Inspection Nr: 1260716.015
Report ID: 0950631
Open Date: 09/01/2017

Site Address:
Hb Parkco Construction, Inc.; Parkco Building Company
18155 Von Karman Ave.
Irvine, CA 92612

Mailing Address:
3190-F Airport Loop Dr., Costa Mesa, CA 92626

Union Status: Union

SIC:

NAICS: 236220/Commercial and Institutional Building Construction


Inspection Type: Accident

Scope: Partial

Advanced Notice: N

Ownership: Private

Safety/Health: Health

Close Conference: 02/08/2018

Emphasis:

Close Case:10/07/2019


Related Activity
Type Activity Nr Safety Health
Accident 1259235
Case Status: CLOSED
Violation Summary
Violations/Penalties Serious Willful Repeat Other Unclass Total
Initial Violations 1 3 4
Current Violations 1 3 4
Initial Penalty $20,250 $0 $0 $2,600 $0 $22,850
Current Penalty $20,250 $0 $0 $2,600 $0 $22,850
FTA Penalty $0 $0 $0 $0 $0 $0

Violation Items
# Citation ID Citaton Type Standard Issuance Date Abatement Due Date Current Penalty Initial Penalty FTA Penalty Contest Latest Event Note
1. 01001 Other 341.4 02/08/2018 $1,250 $1,250 $0 Z - Issued  
2. 01002 Other 1509(A) 02/08/2018 03/15/2018 $750 $750 $0 Z - Issued  
3. 01003 Other 3395(I) 02/08/2018 $600 $600 $0 Z - Issued  
4. 02001 Serious 3395(H) 02/08/2018 02/28/2018 $20,250 $20,250 $0 Z - Issued  

Investigation Summary

Investigation Nr: 99113.015
Event: 08/30/2017
Worker Pouring Concrete Is Sickened By Heat Exhaustion

At 2:45 p.m. on August 30, 2017, Employee #1, employed by a construction company , was engaged in the construction of a parking structure. He was on the 5th lev el and working in direct sunlight with an outdoor temperature of approximately 8 8 degrees Fahrenheit. As Employee #1 helped to clean forms and pour concrete co lumns, he experienced a headache, numbness in his arms and hands, dizziness, and incoherence, and he stopped sweating. Employee #1 was provided water, and emer gency services were called. He was transported to the hospital, treated for hea t exhaustion, and released without hospitalization.

Keywords:building, column, concrete, concrete form work, construction, dizziness, headache, heat, heat exhaustion, pouring

Investigated Inspection
# Inspection Age Sex Degree Nature Occupation
1 1260716.015 Non Hospitalized injury Construction laborers
Back to Top

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.