Inspection Detail
Inspection: 125817353 - Galadridge Construction Inc.
Inspection Information - Office: American Canyon District Office
Site Address:
Galadridge Construction Inc.
2165 Cactus Court
Walnut Creek, CA 94595
Mailing Address:
P. O. Box 427, Alviso, CA 95002
Union Status: NonUnion
SIC:1611
NAICS: 237310/ Highway, Street, and Bridge Construction
Inspection Type: Accident
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 07/29/2003
Emphasis: S:Construction (Cship)
Case Closed: 08/14/2003
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 362346421 |
Investigation Summary
On July 16, 2003, Employee #1, a supervisor of a work crew for a street paving contractor, was operating the asphalt sealcoat machine that was going down a street when the engine stopped. Employee #1 lost all the hydraulic controls and made a sharp left turn to avoid running into a condominium. The machine tipped over and Employee #1 was thrown out, causing a deep laceration in his left thigh along with bruised ribs. Employee #1 was hospitalized.
Keywords: THIGH, LACERATION, RIB, ASPHALT, CONTUSION, OVERTURN, ROAD PAVING
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 125817353 | Hospitalized injury | Cut/Laceration | Supervisors, n.e.c. |
Translate