Inspection Detail
Inspection: 125748293 - Aspen Timco Inc
Inspection Information - Office: Sacramento District Office
Site Address:
Aspen Timco Inc
3100 Ashby (Knauf Plant)
Shasta Lake City, CA 96019
Mailing Address:
Po Box 937, Shasta Lake, CA 96019
Union Status: NonUnion
SIC:1731
NAICS: 0
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 05/17/2001
Planning Guide: Safety-Construction
Emphasis: S:Construction (Cship)
Case Closed: 11/02/2001
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Accident | 361709892 | ||
| Complaint | 78333143 | Yes | |
| Complaint | 78333325 | Yes |
Investigation Summary
An electrical contractor was installing electric cables in a manufacturing plant. A welder-electrician working for the contractor was in the elevated work platform of a scissor lift. As he was adjusting the pulley in a cable-pulling setup, the cable moved and pulled his hand into the pulley. The employee climbed out of the elevated platform and down the side of the scissor lift to the ground. He was transported to a hospital and treated for his injury. There were no fractures to his right forearm, wrist, or hand. The treating physician applied a splint and released the employee for modified duty for 2 days.
Keywords: CAUGHT BY, ELECTRICAL WORK, CRUSHED, PULLEY, HAND
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 125748293 | Non Hospitalized injury | Bruise/Contus/Abras | Misc. electrical & electronic equipment repairers |
Translate