Inspection Detail
Inspection: 1249566.015 - Blue Knight Energy Partners Lp
Inspection Information - Office: Lubbock Area Office
Site Address:
Blue Knight Energy Partners Lp
1611 Marshaal Street
Lubbock, TX 79403
Mailing Address:
1611 Marshall St, Lubbock, TX 79403
Union Status: NonUnion
SIC:
NAICS: 324121/Asphalt Paving Mixture and Block Manufacturing
Inspection Type: Referral
Scope: Partial
Advanced Notice: Y
Ownership: Private
Safety/Health: Safety
Close Conference: 07/26/2017
Emphasis:
Case Closed: 08/01/2017
| Type | Activity Nr | Safety | Health |
|---|---|---|---|
| Referral | 1244083 | Yes |
Investigation Summary
At 8:00 a.m. on July 20, 2017, an employee was unloading items from a fork lift and placing them into a trash receptacle. The employee placed their hand into the mast of the fork lift and got it caught in the chain. The employee amputated the fingertip of their fourth right finger.
Keywords: Amputated, Amputation, Caught In, Chain, Finger, Powered Industrial Vehicle
| # | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
|---|---|---|---|---|---|---|
| 1 | 1249566.015 | 40 | M | Non Hospitalized injury |
Translate