Inspection Detail
Inspection: 1248113.015 - Tobin Bros., Inc.
Inspection Information - Office: Peoria Area Office
Site Address:
Tobin Bros., Inc.
894 Hardin Avenue
Jacksonville, IL 62650
Mailing Address:
2010 Ne Perry Street, Peoria, IL 61603
Union Status: Union
SIC:
NAICS: 238220/ Plumbing, Heating, and Air-Conditioning Contractors
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 07/19/2017
Emphasis:
Case Closed: 11/06/2019
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 1242225 | Yes | |
Inspection | 1251463 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 2 | 3 | 5 | |||
Current Violations | 2 | 3 | 5 | |||
Initial Penalty | $15,337 | $0 | $33,462 | $0 | $0 | $48,799 |
Current Penalty | $12,560 | $0 | $13,800 | $0 | $0 | $26,360 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19260501 B04 I | 12/07/2017 | 05/04/2018 | $9,760 | $9,760 | $0 | 12/28/2017 | F - Formal Settlement | |
2. | 01002 | Serious | 19261203 D | 12/07/2017 | 05/04/2018 | $2,800 | $5,577 | $0 | 12/28/2017 | F - Formal Settlement | |
3. | 02001A | Repeat | 19261203 A | 12/07/2017 | 05/04/2018 | $5,500 | $11,154 | $0 | 12/28/2017 | F - Formal Settlement | |
4. | 02001B | Repeat | 19261204 B | 12/07/2017 | 05/04/2018 | $0 | $0 | $0 | 12/28/2017 | F - Formal Settlement | |
5. | 02002A | Repeat | 19261204 D08 | 12/07/2017 | 05/04/2018 | $5,500 | $11,154 | $0 | 12/28/2017 | F - Formal Settlement | |
6. | 02002B | Repeat | 19261204 F | 12/07/2017 | 05/04/2018 | $0 | $0 | $0 | 12/28/2017 | F - Formal Settlement | |
7. | 02002C | Repeat | 19261204 H | 12/07/2017 | 05/04/2018 | $0 | $0 | $0 | 12/28/2017 | F - Formal Settlement | |
8. | 02002D | Repeat | 19261205 A | 12/07/2017 | 05/04/2018 | $0 | $0 | $0 | 12/28/2017 | F - Formal Settlement | |
9. | 02002E | Repeat | 19261210 B | 12/07/2017 | 05/04/2018 | $0 | $0 | $0 | 12/28/2017 | F - Formal Settlement | |
10. | 02002F | Repeat | 19261210 D | 12/07/2017 | 05/04/2018 | $0 | $0 | $0 | 12/28/2017 | F - Formal Settlement | |
11. | 02002G | Repeat | 19261211 C01 | 12/07/2017 | 05/04/2018 | $0 | $0 | $0 | 12/28/2017 | F - Formal Settlement | |
12. | 02002H | Repeat | 19261211 C02 | 12/07/2017 | 05/04/2018 | $0 | $0 | $0 | 12/28/2017 | F - Formal Settlement | |
13. | 02003A | Repeat | 19261207 A | 12/07/2017 | 05/04/2018 | $2,800 | $11,154 | $0 | 12/28/2017 | F - Formal Settlement | |
14. | 02003B | Repeat | 19261207 D | 12/07/2017 | 05/04/2018 | $0 | $0 | $0 | 12/28/2017 | F - Formal Settlement |
Investigation Summary
At 9:30 a.m. on July 18, 2017, Employee #1 and Coworker #1, employed by a mechanical contractor, were working at a multiemployer construction project, a water treatment facility. They were on top of the Clarifier/Flocculation Basin and pushing stems through two open hatches. As Coworker #1 pushed the stems into the guides, Employee #1 peered into one of the open hatches to help line up the stems. Coworker #1 requested cribbing to hold up the stems. As Employee #1 turned to go for the needed material, he stepped into and fell through the open hatch to the concrete surface below, a fall height of approximately 22.5 feet. Emergency services were called, and Employee #1 was transported to the hospital. He was admitted and treated for fractured ribs, a punctured lung, a fractured shoulder blade, crushed vertebrae, and a ruptured back disc.
Keywords: Back, Construction, Fall, Fall Protection, Floor Opening, Fracture, Hatch, Lung, Rib, Vertebra
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1248113.015 | 52 | M | Hospitalized injury | Plumber, pipefitter and steamfiter apprentices |