Inspection Detail
Inspection: 1248109.015 - Horizon Building Concepts
Inspection Information - Office: Milwaukee Area Office
Site Address:
Horizon Building Concepts
3921 West Lincoln Avenue
Milwaukee, WI 53215
Mailing Address:
2374 South Woodward St., Milwaukee, WI 53207
Union Status: NonUnion
SIC:
NAICS: 541990/ All Other Professional, Scientific, and Technical Services
Inspection Type: Referral
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 07/18/2017
Emphasis:
Case Closed: 11/02/2017
Type | Activity Nr | Safety | Health |
---|---|---|---|
Referral | 1241875 | Yes |
Investigation Summary
At 2:00 p.m. on July 18, 2017, two employees were refueling their compressed natural gas (CNG) van when the CNG system failed and exploded. The employees suffered leg amputations due to shrapnel wounds as well as sustaining several lacerations. Details surrounding the amputations were unclear from the incident report. Both employees were hospitalized.
Keywords: Amputated, Amputation, Compressed Gas, Explosion, Laceration, Leg
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1248109.015 | 40 | M | Hospitalized injury | Laborers, except construction | |
2 | 1248109.015 | 40 | M | Hospitalized injury | Laborers, except construction |