Inspection Detail
Note: The following inspection has not been indicated as closed. Please be aware that the information shown may change, e.g. violations may be added or deleted. For open cases, in which a citation has been issued, the citation information may not be available for 5 days following receipt by the employer for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection: 1245059.015 - Soil Engineering Construction, Inc.
Inspection Information - Office: Bakersfield District Office
Site Address:
Soil Engineering Construction, Inc.
251-255 Harlow Ave.
Pismo Beach, CA 93449
Mailing Address:
927 Arguello St., Redwood City, CA 94063
Union Status: NonUnion
SIC:
NAICS: 541330/Engineering Services
Inspection Type: Accident
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 12/20/2017
Emphasis:
Close Case:
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 1238157 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 2 | 1 | 7 | 10 | ||
Current Violations | 2 | 1 | 5 | 8 | ||
Initial Penalty | $36,000 | $0 | $2,100 | $7,360 | $0 | $45,460 |
Current Penalty | $25,200 | $0 | $700 | $3,425 | $0 | $29,325 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Other | 342(A) | 12/26/2017 | 01/10/2018 | $2,250 | $5,000 | $0 | 02/05/2018 | F - Formal Settlement | |
2. | 01002 | Other | 1637(B)(6) | 12/26/2017 | 01/10/2018 | $225 | $225 | $0 | 02/05/2018 | F - Formal Settlement | Citation has been deleted. |
3. | 01003 | Other | 1509(E) | 12/26/2017 | 01/10/2018 | $165 | $335 | $0 | 02/05/2018 | F - Formal Settlement | |
4. | 01004 | Other | 3395(C) | 12/26/2017 | 01/10/2018 | $450 | $450 | $0 | 02/05/2018 | F - Formal Settlement | |
5. | 01005 | Other | 3395(H) | 12/26/2017 | 01/10/2018 | $335 | $450 | $0 | 02/05/2018 | F - Formal Settlement | |
6. | 01006 | Other | 3395(I) | 12/26/2017 | 01/10/2018 | $225 | $450 | $0 | 02/05/2018 | F - Formal Settlement | |
7. | 01007 | Other | 1711 | 12/26/2017 | 01/10/2018 | $450 | $450 | $0 | 02/05/2018 | F - Formal Settlement | Citation has been deleted. |
8. | 02001 | Repeat | 1509(A) | 12/26/2017 | 01/10/2018 | $700 | $2,100 | $0 | 02/05/2018 | F - Formal Settlement | |
9. | 03001 | Serious | 1637(B) | 12/26/2017 | 01/05/2018 | $12,600 | $18,000 | $0 | 02/05/2018 | F - Formal Settlement | |
10. | 04001 | Serious | 1637(C) | 12/26/2017 | 01/05/2018 | $12,600 | $18,000 | $0 | 02/05/2018 | F - Formal Settlement |
Investigation Summary
At approximately 11:30 a.m. on June 27, 2017, four employees were pouring a slur ry concrete at a rebar wall against the slope. The scaffold gave way, all four e mployees were injured when scaffold fell and the rebar wall fell on top of the e mployees. The employees suffered from multiple fractures resulting in hospitaliz ation of two employees.
Keywords:concrete, fall, falling object, fracture, rebar, scaffold, struck by
# | Inspection | Age | Sex | Degree | Nature | Occupation |
---|---|---|---|---|---|---|
1 | 1245059.015 | Hospitalized injury | Construction laborers | |||
2 | 1245059.015 | Hospitalized injury | Construction laborers | |||
3 | 1245059.015 | Non Hospitalized injury | Supervisors; carpenters and related workers | |||
4 | 1245059.015 | Non Hospitalized injury | Construction laborers | |||
5 | 1245059.015 | Non Hospitalized injury | Supervisors; carpenters and related workers |